ML17296A802

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Comsip,Inc Containment Gas Analysis Sys Pump.Protection for Pump Is Inadequate in Case of Inadvertent Closure of Outlet Valve W/Pump Running.Units Will Be Modified Per Comsip,Inc Instructions
ML17296A802
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/09/1980
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17296A801 List:
References
NUDOCS 8007160658
Download: ML17296A802 (6)


Text

FINAL REPORT REPORTABLE DEFICIENCY 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS //1,

//2 AND 83 I

Descri tion of Deficienc A lack of protection exists for the'ontainment gas analysis system pump in the event of an inadvertent closure of the outlet valve with the pump running.

Comsip, Incorporated has reported this condition under the requirements of 10CFR21.

See attached letter from Comsip, Incorporated to Bechtel Power Corporation, dated April 24, 1980.

II Anal sis of Safet Im lications This condition is considered reportable since it acknowledges the deficiency described in the 10CPR Part 21 filed by Comsip, Incorporated.

III Corrective Action Units containing the deficiency have been shipped to the PVNGS jobsite.

Bechtel has initiated contact with Comsip to obtain the modification kit 'details and modification instructions.

Upon receipt of these data, Bechtel willmodify the units at the construction site in accordance with established field change procedures (Design Change Package).

See attached letter B/CDI-E-28346, dated June 6,

1980.

a i

I f

I

'l~

~

~

CQIBIIpg((ac.

instrument encl control systems CtISTOI'.LINE DIVISION 1418 E, Linden Awnue P.O. Box 152 Linden, NJ 07036 (201) 486.1272 Telex 13 8496 DELPHI SYSTEMS DIVISION 10650 E, Rush Street South EI Monte. CA 91733 (213}442.0882 Telex 67 4768 April 2tt, 1980 Bechtel Power Corporation Gaithersburg, Haryland 20760 Attention:

Corporate Ouality Assurance Hanager Gentlemen:

Pursuant to the recent investigations o

lant o

t o Com foun h

szp, nc. has on a3.nment gas anal s

h h

1 l

d return lines are closed off while gas system pumps are still xunning.

Since the lant d th lt' p

operat3.ng procedures a

ese instruction to od'f th y

p p

~

p i y e system um valves may be clos d

h manua ly operated sam e

wxt out subse ue ample lane isolation containment gas system.

q't damage to the Please fin find enclosed a copy of the d th f'd d'n d

h

'e modification.

Not d

o dCo yo to contact us as soon rov3.de the mOd3.fzcat3.on k3.t to the Ver '

uly yours ug

.e Anas asi Customer Service Haanager e phd Systems Division EA/i

num er s to assist Bechtel Pield Pe ca on ta and associated docunents ~ Is this modification included i th your plan for qualifying. Pl n t e qualification uni. ~t. If not please state ease respond by June 20, 1980. Very truly yours, VGB: JLH:lrv BECHTEL PCMER CORPORATION ORIGIHAL SIGHZD. BY R. H. STIEHS Vi C. Bingham Pro]ect Engineering Manager Los Angeles Pover Division cc: E. E. Van Brunt, Jr. e ~ ~ ~ I I