ML17296A794
| ML17296A794 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/03/1980 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML17296A795 | List: |
| References | |
| ANPP-15814-BSK, NUDOCS 8007140339 | |
| Download: ML17296A794 (6) | |
Text
REGULATORY ORMATION DISTRIBUTION SYS I (RIDS)
ACCESSION NBR:8007140339, DOC ~ DATE! 80/07/03 NOTARIZED:
NO DOC FACIL!STN-50~528 Palo Verde Nuclear StatjonP Unit 1E Arizona Publi STN-50-529 Palo Verde Nuclear StationE Unit 2E Arizona Publi 05000529 AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTEE ~ K.
Arizona Public Service Co ~
RECIP ~ NAME RECIPIENT AFFILIATION SPENCEREG,ST Region 5E San Franciscoi Reactor Construction 8 Engineer
SUBJECT:
Forwards interim deficiency rept re operability failure of vertical fire dampers, DISTRIBUTION CODE:
BOISS COPIES RECEIVED:LTR L ENCL L SIZE:~+j TITLE: Construction Deficiency Report (10CFR50
~ 55K)
KS ~ 8'7 AA'DAA'bl aEb PLEA/ 7
~
NOTES.
D RECIPIENT ID CODE/NAME ACTION:
AD 4(CENSAV<21 LA 4 6Eq Ji 20 COPIES LTTR ENCL 1
1 1
1 RKCIPIKNT COPIES ID CODE/NAME LTTR ENCL BC ECHcar8ACA',15 >
~
1 1
PMPfKRR]CWP, 14 W 1
1 INTERNAL: AD/RCI/IE DIRE HUM FAC SFY EQUIP QUAL BR16 HYD/GEO BR 22 LIC QUAL BR MPA 08 OELD 23 P
T REV BR 01 1
1 1
1 1
1 1
1 1
1 1
1 1
1 AEOD KDO 8
STAFF 07 FIELD COOR/IE13 I8E 05 MOOREiV ~
NRC PDR 02 OR ASSESS BR 17 QA BR 10 STANDRDS DEV 11 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 EXTERNAL: ACRS NSIC 20 0g 16 16 1
1 LPDR 03 1
1 JUL >~ 19SO TOTAL NUMBER OF COPIES REQUIRED:
LTTR 01 ENCL 4 1
~
II ff I I 1
1 ff I
f h
1 I't I
ff 11 D
- v@o "a
~x::~.- sa,~ b,449
~ "~
I
~
~ i 4 j",.4'w%QV)9,3'~
,45 5'N'h9~=K+a 4
4VA44%:s b 3-'
I I
)
n h
)
)
~'1 WI
)
)
j
A
'/
wufMklttQ~IIIVDXIIIM5MW P. O. BOX 21666
'HOENIX, ARIZONA 65036 July 3, 1980 ANPP-15814-BSK/JAR U.
S. Nuclear Regulatory Commission Region V Walnut Creek Plaza Suite 1990 North California Boulevard Walnut Creek, California 94596 Attention:
Mr. G.
S. Spencer, Chief Reactor Construction and Engineering, Support Branch
Subject:
A 50.55(e) Potentially Reportable Deficiency Relating to Operability Failure of Vertical Fire Dampers Interim Report File:
80-019-026
Reference:
Telephone Conversation between J. Eckhardt and B.
S. Kaplan on June, 4, 1980 (DER 80-9)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation.
At that"time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an interim report is attached.. It is'ow expected that this informa-tion will be finalized by September 15, 1980, at which time a complete report will be submitted.
/
Very truly yours, QJU E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc Attachment Soovi40330
J W
~
~
k K
N l'
Mr. G.
S.
Spence
, Chief Reactor Construction and Engineering Support Branch ANPP-15814-BSK/JAR July 3, 1980 Page 2
CC:
"Victor Stello,-Jr., -Director
-'ffice of Inspection and Enforcement U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 A.
C. Gehr Snell
& Wilmer R. L. Robb D. B. Fasnacht B.
S. Kaplan W. E. Ide J.
M. Allen A. C. Rogers W. H. Wilson W.
G. Bingham W. J. Stubblefield J.
E. Bashore R.
W. Welcher R.
M. Grant D.
R. Hawkinson J.
Brand
~ )
I I
J!
'll
'l~