Advises That Commitment Made in 800324 Preliminary Deficiency Rept Will Not Be Met.Info from Qualification Testing Will Not Be Available within 60 Days,Due to Implementation Difficulties.Info Finalized by 800801
ML17296A733
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/23/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-15507-BSK, NUDOCS 8006030351
Download: ML17296A733 (6)


Text

REGULATOR NFORMATION DISTRIBUTION l'EM (R IDS)

ACCESSION NBR:8006030351 DOC ~ DATE: 80/05/23, NOTARIZED'O D

FACIL:STN-50 528 Palo Verde Nuclear Stationi Unit-li Arizona Publi STN-50 529 Palo Verde'Nuclear StationF Unit 2i Arizona Publi 0

9 STN 50-530 Palo Verde Nuclear Stationc Unit 3r Arizona Publi 05000530 AUTH BYNAME AUTHOR AFFIL'IATION VAN BRUNTEE ~ ED Arizona Public Service Co.

RECIP ~ NAME RECIPIENT AFFILIATION SPENCERFG

~ ST Region 5F San Franciscog Reactor Construction 8 Engineer

SUBJECT:

Advises that commitment made in 800320 preliminary deficiency rept will not be met

~ Info from qualification testing will not be available within 60 daysidue to implementation difficulties,Info finalized by 800801.

DISTRIBUTION CODE:

B0195 COPIES RECEIVED:I.TR j ENCL g SIZE: e TITLE: Conetructfon Deflclency Report (10CFR50.55E)

NOTES: ~EUe~CQLE:KA,=P48<C

~ ACTION; INTERNAL; RECIPIENT ID CODE/NAME 14 PM Et LICflXH 20 LA Leg W~

01 05 08 MPA 10 GAB 13FIELD COOR/IE 17 AD PLANT SYS 22 DIR DPM AD/RCI/IE AEOD GEOSCIENCES BR ILC 8YS BR MECH ENG BR STRUCT ENG BR COPIES LTTR ENC 1

1 02 NRC PDR 07 EDO L STAFF 09 DEPY DIR DPM 11 STANDRDS DEV 16 AD FOR ENGR 17 AD/COREECONT 23 OELD AD/SITE TECH DIRECTOR DSE HANAUERpS ~

MATL ENG BR POHER SYS BR 1

1 1

1 1

1 1

1 1

1 1

RECIPIENT COPIES L

ID COD//NAME LTTR ENCL 15 BC C4rg m'3 1

21 AD 1

EXTERNAL: 03 LPDR 24 ACRS 1

16 1

. 04 NSIC

.tl!N

~ 1989 0

TOTAL. NUMBER OF COPIES REQUIRED:

LTTR 08 ENCL

C I ~

U U

a Q

h

'/

IPWIBLM3~I@I CECNHIGCKVW P. 0 BOX 21666

'HOENIXP ARIZONA 65036 May 23, 1980 ANPP-15507-BSK/JAR U ~

ST Nuclear Regulatory Commission Region V

Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention Mr. G.

ST Spencer, Chief Reactor Construction and Engineering Support Branch Subject A 50.55(e)

Reportable Condition Relating to Class IE 600V, Power Cable File:

80-019-026

Reference:

ANPP-15090-JAR, dated March.24, 1980 Dear Sir A preliminary written report of a reportable deficiency under 10CFR 50'5(e) was transmitted by the referenced letter.

At that time it was estimated that information from qualification testing would be available within sixty (60) days The qualification testing is not complete due to difficulties encountered during its implementation.

It is now expected that this information will be finalized by August 1,

1980, at which time a complete report will be submitted The Stop Work order, issued March 5,

1980, on installation of the Rockbestos Class IE cables will remain in effect until completion of the test program.

A decision will then be made on the disposition of the quarantined cable and the cable previously pulled Very truly yours ED ED Van Brunt, Jr APS Vice President Nuclear Proj ects ANPP Project Director EEVBJr/BSK:skc 80060S0 35 l

f y ~~ <<t>

U.

S. Nuclear Regulatory Commission Region V Attention:

Mr. G.

S.

Spencer, Chief ANPP-15507-BSK/JAR May 23, 1980 Page 2

cc:

Victor Stello, Jr., Director~

Office ofMnspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 A. C. Gehr Snell

& Wilmer R. L.

D.

B.

B. S.

W. E.

J.

M.

A. C.

W. H.

W.

G.

W. J.

J.

E.

R.

M.

D.

R.

Robb Fasnacht Kaplan Xde Allen Rogers Wilson Bingham Stubblefield Bashore Grant Hawkinson

P Il