Forwards Interim Deficiency Rept Re Rockbestos Co 600 Volt Copper Power Cable Delivered & Partially Installed at Facility.Results of Qualification Testing Are Required Before Final Corrective Action Can Be Taken
ML17296A658
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/24/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17296A659 List:
References
ANPP-15090-JAR, NUDOCS 8004010350
Download: ML17296A658 (6)


Text

REGUL'ATORY ORMATION DISTRIBUTION SY 9

(RIDS)

ACCESSION NBR 8004010350 DOC ~ DATE 80/03/24 NOTARIZED NO DOCKET

. FACIL:STN-SO S28 Palo Verde Nuclear Stationi Unit iE Arizona Publi 05000S28 AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTiE ~ ED Arizona Public Service Co ~

REC IP ~ NAME REC IPIKNT AFFILIATION SPENCEREG

~ ST Region SE San FranciscoE Reactor Construction 8 Engineer

SUBJECT:

Forwards interim deficiency rept re Rockbestos Co 600 vo.lt copper power cable delivered 8 partially installed at facility'esults of qualification testing are required before final correcti,ve action can be taken'ISTRISUTION CODE:

DOIN'S COPIES RECEIVED:LTR 2'NCL i SIZE: 4X+

TITLE: Construction Deficiency Report" (10CFR50

~ SSE)

NOTES: $ 7 RAIP~JI++g

+ZHAI7 RECIPIENT COPIES ID CODE'/NAME~'TTR ENCL ACTION; '4 PM g. 6/C/T 4g 1

1

-20 LA Chug ~g 1

1 RECIPIENT ID CODE/NAME 15 BC 6ul 4 4'3'1 AD COP IKS LTTR ENCL 1

1 1

1 INTERNALs REG FILE 08 MPA 10 QAB 13F IELD COOR/IEl 17 AD PLANT SYS 22 DIR DPM AD/RCI/IE AEOD GEOSC IENCES BR I8C SYS BR MECH ENG BR STRUCT ENG BR EXTERNAL': 03 LPDR 24 ACRS 1

1 2

.2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 16 16 02 NRC PDR 07 EDO 8

STAFF 09 DEPY DIR DPM 11 STANDRDS DEV 16 AD FOR ENGR 17 AD REAC SFTY 23 OELD AD/SITE TECH DIRECTOR DSE'ANAUERiS

~

MATL ENG BR POKER SYS-BR 04 NSIC 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

4~R 8 19so TOTAL NUMBER OF-COPIES REQUIRED:

LTTR 48 ENCL 48

0

,8 IP g

f, H

)I l

I, jl I

-kg~

IPXIIZIMXI~Ba aCOKIWS!M'W P. 0 BOX 2I666

'HOENIX'RIZONA65O36 March 24, 1980 ANPP-15090-JAR U.

S. Nuclear Regulatory Commission Region V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention:

Mr. G.

S. Spencer, *Chief Reactor Construction and Engineering Support Branch

Subject:

A 50.55(e)

Reportable Condition Relating

'to Class IE, 600V, Power Cable File:

80-019-026

Reference:

Telephone Conversation between L. Vorderbrueggen and J. A. Roedel of March 6, 1980

Dear Sir:

Attached, is our preliminary written report of a reportable deficiency under 10CFR50.55(e),

relating to factory repaired 600V cable delivered and partially installed in Unit

$/1 of the Palo Verde Nuclear Generating Station.

The results of the qualification testing now being conducted on the apparent deficient material are required before Arizona Public Service can determine what final corrective action will be taken.

It is expected that this information will be available in approximately sixty (60) days.

Very truly ours auu r~

E. E. Van Brunt, Jr.

APS Vice President Nuclear. Projects ANPP Project Director EEVBJr/JAR:skc Attachment poi+

00040X0 3 8 e

I 1

)

'I

U. S. Nuclear Regulatory Commission Region V Attention:

Mr. G.

S.

Spencer, Chief ANPP-10590-JAR March 24, 19SO Page 2

7 cc: ~Victor Stello, Jr., Director.

Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 A. C. Gehr Snell

& Wilmer R. L.

L. W.

B. S.

W. E.

J.

M.

A. C.

W; H.

W.

G.

W. J.

J.

E.

R. M.

D. R.

Robb Price Kaplan Ide Allen Rogers Wilson Bingham Stubblefield Bashore Grant Havkinson

~