ML17296A649
| ML17296A649 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/06/1980 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Ross D Office of Nuclear Reactor Regulation |
| References | |
| ANPP-14969, NUDOCS 8003250534 | |
| Download: ML17296A649 (8) | |
Text
~a REGULATORY ORMATION DISTRIBUTION SY'.QM (RIDS)
ACCESSION NBR:8003250534 DOC,DATE: 80/03/06 NOTARIZED:
NO DOCKET FACIL!STN 50-528 Palo Verde Nuclear Station~
Unjt li Arizona Publj 05000528 STN 50 529 Palo Verde Nuclear Stationg Unit 2P Arizona Publi 05000529 AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTPE,E, Arizona Public Service Co'.
RECIP ~ NAME RECIPIENT AFFILIATION ROSSID ~ F, Division of Project Management
SUBJECT:
Forwards exhibits.re util caseload forecast 8 proposed review schedule<discussed at 800228 meeting w/Bechtel C
Ed NRC,'.NRC was briefed at" meeting re cutr ent status of util const 8 measures to expedite review schedule DISTRIBUTION CODE:
BOOIB COPIES RECEIVED:LTR JENCLl J SIZE:
TITLE: PSAR/FSAR AMDTS and Related Correspondence WWWm@m5hdt R.C-'.i~
4> wM~V NOTES+
W, tPh~
C )~
RECIPIENT COPIES ID CODE/NAME L>>TTR ENCL ACTION; 05 PMF
~ 4 '~ <~~91 1
BC ~~@ ~~
1 0
RECIPIENT ID CODE/NAME'D L ~gz LA ~~~~ +
COPIES LTTR ENCL' 0
1 0
INTERNAL:
06 I L
E 09 GEOSCIEN BR 11 MECH ENG BR 13 MATL~ ENG BR 16 ANALYSIS BR 18 AUX'YS BR 20 I L
C SYS BR 22 AD SITE>> TECH 27 EFFL>> TRT SYS 29 KIRKWOOD AD PLANT SYS AD SITE ANLYSIS HYDRO ME>>TEOR BR OELD 1
1 3
3 4
1 2
2 1
1 1
1 1
1 1
0 1
1 1
1 1
0 1
0 2
2 1
0 02 NRC PDR 08 OPERA LIC; BR 10 GAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 CONTAIN SYS 21 POWER SYS BR 26 ACCDNT ANLYS 28 RAD ASMT BR AD FOR ENG AD REAC'AFE~TY DIRECTOR NRR MPA 1
1 1
1 1
1 1
1 1
1 1
1.
1 1
1 1
1 1
1 1
0 1
0 1
0 0
EXTERNAL; 03 LPDR 30 ACRS 1
1 10 10 04 NSIC 1
1 mQ Qca Q
~g'+ W2 T
~p'~ M2 TOTAL NUMBER OF COPIES REaUIRED:
LTTR ~
ENCL 41
~ 4 ~
n
~
0
4 cl O
n EPEK3M(Q IX (QCo)EQlM~'F P. O. BOX 2I666
'HOENIX'RIZONA65036 March 6, 1980 ANPP-14969 JMA/DBK Mr. D. F.
Ross, Jr., Director Division of Project Management U.S. Nuclear Regul;atory, Commission Washington, D.C.
20555 Re:
Palo Verde Nuclear Generating Station PVNGS Units 1, 2 and 3
Dear Mr. Ross:
Attached for your information are copies of two exhibits which were discussed in a February 28, 1980 meeting between representatives of Arizona Public Service Company, Bechtel, and Combustion Engineering, Inc.
and Mr. Licitfa of your staff.'n this meeting, Mr. Licitra was briefed on the current status of PVNGS construction, APS's assess-ment of the PVNGS review schedule and APS's suggestions to expedite the PVNGS review schedule.
We look forward to meeting with Harold Denton and yourself on March 11, 1980 to discuss the schedule for review of the Palo Verde application by the NRC.
If I can provide any additional information, please do not hesitate to contact me.
Very truly yours, ra~~
E.
E.
Van Brunt, APS Vice President, Nuclear Projects ANPP Project Director EEVBJr/DBK/av Attachment
)
l
PVNGS/CASELOAO FORECAST COHPARISON 83 I
79 75 71 67 G I 59 55 51 17 43 39 35 31 27 23 19 15 11 7
3 I
1 I
73 69 65 61 57 53 49 45 41 37 33 29 25 21 17 13 9
4 1 0 I
61 57 53'9 45 41 37 33 29 25 21 17 13 9
5 10 100 90 80 70 1 YEA)l NSSS STAHT PAE OP TES I' YEAR NSSS COMP C.)I, S TAIIT PRE OP TLS I STAAT PAE OP
=TEST CO)'/)P C.) I.
MP C.)l.
77 F.L.
87 F L.
GO 50 40 30 STAff T NSSS START APV SET 4/79 2/80 STAAT NSSS STAR'T STAT)T NSSS RPV SET 1 YEA))
NSSS-20 10 I
I 11/76 4
8 12 16 20 21 2U 32 36 40 4) 48 52 56 60 61 68 72 76 80 8<
5 ELAI'SFD I'IME Ff)OR) Fll)STCONCIIL'TL'BK
- 2/80
I 41
~ )
I
(
J l
l
PROPOSED PVNGS REVIEW SCHEDULE BEGIN SUBMIT REVIEW V
ER IIWI~IRIRIRIRIIWI 10 DESV BEGIN SUBMIT REVIEW v
V
'=LIR Ql I Im I Wm I mm I R BEGIN SUBMIT REVIEW DOCKET V
T' FSAR I ~ I 5 I 5 I 51 12 SER 2 V S
E R
A F
SU S
II, P HEARING 3
Tt 2 T ASLB ECISION ASLAB>>
APPEA S OL BEGIN DOCKET REVIEW T
CESSAR I ~ I ~ I ~ I 8 I SER ACRS T
2 3
FDA.I
>> Does not allow for any review by Commission onits motion or petition by any Intervenor I< I>I>> IF IM AIMIJelJYI<lslol~lo J IFIMIA MiJelJylA jslOlNlD 1979 1980 1981 I F I Ml > I<I"eIJvj < ls 1 o [rui o 1982 dbi( 3.80
~
~