ML17296A607

From kanterella
Jump to navigation Jump to search
Submits Addl Info in Response to Violation Noted in IE Insp on 790319-23.Corrective Actions:Diesel Generator Openings Properly Sealed
ML17296A607
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/31/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML17296A604 List:
References
ANPP-14370-JAR, NUDOCS 8003050193
Download: ML17296A607 (2)


Text

3 XfHE IIV ~SN CICOKQMKZiF P. O. BOX 21666 PHOENIX'RIZONA SSO36 Docket Hos.

50-528, 50-529, 50-530 January 31, 1980 ANPP-14370-JAR U.

S. Nuclear Regulatory Commission Region V

Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention:

Subject:

Reference:

Mr. G.

S.

Spencer, Chief Reactor Construction and Engineering Support Branch Additional Information Relating to l&E Inspection of March 19-23, 1980 Letter ANPP-14615-JAR, dated January 11,
1980, from E.

E. Van Brunt, Jr. to G.

S. Spencer, same subject

Dear Sir:

The referenced letter transmitted supplementary information relating to the shipment and receipt of the Palo Verde Nuclear Generating Station Unit /Il diesel generators.

Unit 81 diesel generators from Cooper Energy Services when received were not in conformance with Cooper Energy Services'tandard SD-40-2N, Paragraph 5.6, in that the generator openings were not barrier sealed as required by Para-graph 5.6.

Subsequently, discussions were held with the supplier to effect appropriate corrective action.

This corrective action was verified by the receipt of the Unit 82 diesel generators which were received with these generator openings properly sealed.

We feel confident that the Unit /I3 diesel generators will arrive at the construction site in full compliance with the supplier's standards.

EEVBJr/JAR:skc cc:

R.

L.

Robb L.

W. Price B.

S. Kaplan W.

E. Ide A.

C. Gehr W.

H. Wilson W. J. Stubblefield R.

M. Grant J.

E. Bashore Very truly

urs, n~

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director

~,y 8008050 )qg