ML17296A271
| ML17296A271 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/02/1979 |
| From: | Turley K ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Jennifer Davis, Harold Denton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7901080156 | |
| Download: ML17296A271 (4) | |
Text
<
RFGUL
)BY INFORMATION DISTR IBUTIiR,SYSTEM (R I DS)
ACCESSION 0.1 56 DOC. DATE - 79/01/02 NOTAR IZFD ~
NO FACII:
N-50-5>
LO VERDE ¹ I, ARIZONA PUBLIC SERVICE'O.
-529 PALO VERDE ¹2, ARIZONA PUBLIC SERVICE CO.
STN-50-530 PALOVERDE ¹3 ARIZONA PUBLIC SFRVICE CO.
AUTH.NAME AUTHOR AFFILIATION TURLEY,K.
AZ PUB SVC RECI P ~ NAME RECIPIENT AFFILIATION DENTON,H ~ B.
OFFICE OF NUCLEAR BEACH)B REGULATION DAVIS'
~ G.
OFFICE OF INSPECTION 8,
ENFORCEMENT
SUBJECT:
Responds to 781206 NRC 1tr expressing concern over accuracy 8, completeness of submitted info.Confirms util policies 8,
procedures are adequate 8 accurate in the preparation of
.info.
DISTBIBUTION CODE: B001B, COP I ES RECEI,VED-LTB t ENCL ~
SI ZF:
TITLE-PSAR/FSAB AMDTS AND RELATED CORRESPONDENCE.
NOTES i 5<MP~~M~ PC~Q 0)
DOCKET ¹~
05000528 05000529 05000530i ACTION-RECIPIENT ID CODF/NAMF 05 PM gqWi('M BC L.~~3 COPIES LTTB ENCL BEC IPI ENT I D CODE/NAME AD qP SSA(-Lo LA LMP-NQ COPIES LTTR ENCL I NTERNAL: 0, 06 8,
E 0.9 GEOSCIEN BR 11 MECH ENG BR 13 MATL ENG BR 16 ANALYSIS BB 18 AU'X SYS BR 20 I 8 CSYS BR 22 AD SITF TFCH 27 EFFL TBT SYS 29 KIRKNOOD AD.PLANT.SYS AD SITE ANLYSIS MPA EXTERNAL>
03 LPDB 30 ACBS 1
2 1
1 2
1 1
,1 I
1 1
1 I
1 16 02 NRC PDR 08 OPFRA LIC BR
.10 GAB 12 STBUC ENG BB 15 REAC SYS BB 17 COBE PEBF BB 1.9 CONTAIN SYS 21 POWER SYS BB 26 ACCDNT ANLYS
~
28 RAD ASMT BR AD FOR ENG AD BEAC SAFETY DIRECTOR NRR OELD 04 NSIC 1
1 1
1 I
I 1
1 1
1 1
1 1
0 1
0 1
1 0
TOTAL NUMBER OF COPI ES REQUI RED:
LTTB 55 ENCL 46-
~
~
1 I I
(
t
)
I 5
r t>>j>>'I 't I'el I,
f
>>r t 1>>>>trt P
ftt 1
t r ()
f l t
t 1
tl ~
t
,,j
)
I>>
i 1
r,
)0 l0' I
',,I I
0!'",
l 0
IRWC3hll03 QKRIWFEUIEI GBCOIBISUl2I'P P. O. BOX 2I666
~
PHOENIX. ARIZONA 65036 KEITH TURLEY PRESIDENT AND CHICF CXCCUTIVEOFFICER January 2,
1979 Office of Nuclear Reactor Regul ati on and
~John G. Davis, Acting Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.
C.
20555 RE:
Docket No. 50-528/529/530/592/593 Gentlemen:
This is in response to your letter of December 6, 1978, in which you expressed concern for the accuracy and completeness of information submitted to NRC by licensees and applicants.
I have reviewed the specific items addressed in your letter with the Executive Vice President of Operations, the Vice President of Nuclear
- Projects, and the !tanager of guality Assurance.
The results of this review clearly confirm that Arizona Public Service Company has adequate policies and procedures to assure the accuracy and completeness of our responses to the Nuclear Regulatory Commission.
These policies and procedures are integral to our guality Assurance Program which, in turn, provides APS with essential management controls of our activities.
I welcome this opportuni ty to emphasize to you that the responsible officers and managers of Arizona Public Service Company have my full cooperation, support and involvement in our efforts to assure that the Palo Verde Nuclear Generating Station is designed, constructed and op-erated with the health and safety of the public foremost in our minds.
incer el
~
C QI.,
KT:mft VODER osot
4