ML17296A254
| ML17296A254 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/30/1978 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Boyd R Office of Nuclear Reactor Regulation |
| References | |
| ANPP12205JMAWFQ, NUDOCS 7812110126 | |
| Download: ML17296A254 (18) | |
Text
REGULATOR INFORMATION DISTRIBUTION TEM (BIDS)
ACCFSSION NBR-7812110126 DOC.DATF: 78/1-1/30 NOTARIZED-(gag>
ABACI'LtSTN-5
~~ALO VERDE //I, ARIZONA PUBLIC SERVICE CO.
STN-50-529 PALO VERDE P2, ARIZONA PUBLIC SERVICE CO.
STN-50-530 PALOVERDE 83, ARIZONA PUBLIC SERVICE CO.
AUTH.NAMF AUTHOR AFF I.LI ATI ON VAN BRUNT,E.E.
AZ PUB.SVC RECIP.NAME RECIPIENT AFFILIATION BOYD, R.S.
- DIV.
OF PROJECT MANAGFMENT SUBJECT'Forwards addi info requested in 781114 meeting re Quality Assurance Prog for fire Protec,which will also be incl in next amend to Fire Protec Eval.
DISTRIBUTION CODET B002S COPIES RECEIVED:LTR I
ENCL I
S IZFc TITLEs FIRE PROTFCTION (PRIOR TO ISSUANCE OF OL).
NOTES!
DOCKET 0 050005280 05000529
,05000530 RECIPIENT COPIES ID CODE/NAME LTTB ENCL ACTIONS 05 BC LVR83 01 01 LA LMR!f3 I
0 RECIPIENT ID CODE/NAMF 06 pq STRIGHT COPIES LTTB ENCL 01, 01 INTERNAL:
BEG FILE 0
1.1 AUXIL SYS BB 14 HANAUEB DIRECTOR DPM MURANAKA,B.
VASSALLO 01
.I 03 03 2
2 1
I 1
0
.I 0
I 02 NBC PDR
.10 AD PLANT SYS 13 QAB AD FOB QA8, 0 I8,C S YS BB OELD YOUNG,D.E.
0 1
01 0.1 O.l I
I I
0 I
0 I
0 I
0
~ EXTERNALS 03 LPDB O.I OI JI5 PNR SYS BB (IH't~tYI
.1 g8 OPER LIC BPI~
I
.I MD SYS A PRO+f~Nyk) 0 04 NS IC I
I H6 PLANT SYS B(IAIT) 2 2
19 ACRS 16 16 DIRECTOR DOR(IAIIEFA+Z) 0 DEC ld 1S78 TOTAL NUMBER OF COPIES B EQU I RED:
LTTR 44 ENCL 34
h (f)NJ A
(T Jt I
3 P
A>>tt
'f 3
,( ~
A>>
' (
1(
)l
<<(
A e
A A
\\
t'I l
e 3
P
)'
3 ~
It
~
)
If P
A
<<Ee
,t <<;
T)
(
C>>I 3) A '( I ft ep 3 (A
'e A
ee I
l 0
I T
S
.= ~ 1 l>>,,(,f >>>>
ri 33 l3t II I)'t j
3 I f<<<<')P
~
(I V
3 I',
3 tt
(
g 0
'etl 3
'I Ptt
)
t(
C I
tf It<<'
I >>
A I()I(
o
.(A(
l TI
(
A t
3 3*
r I! ~
I(
1
REGLILATOHYDOCKET FILE COPy Ba aKeKMMV P. O. BOX 2I666
'HOENIX, ARI2ONA 65036 November 30, 1978 ANPP-12205-JMA/WFg Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Roger S.
Boyd, Director Division of Project Management Re:
Palo Verde Nuclear 'Generating Station Units 1, 2
8 3
Docket Numbers:
STN-50-528/529/530 File:
78-054-026
Dear Sir:
As discussed in the meeting on November'14, 1978 between members of the NRC staff and Arizona Public Service, we are submitting
- herewith, as Attachment 1, the additional information relating to the guality Assurance Program for Fire Protection (NRC guestion 83).
This information will also be included in the next amendment'o Fire Protection Evaluation.
Sincerely, STATE OF ARlZONA
)
)
ss County of Maricopa
)
E.
E.
Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director On its own behalf and as Agent for all other joint applicants.
Subscribed and sworn to me this' day
- November, 1978.
My Commission Expires:
leafy CoI",.mI"=sta,.:::Iris j..II. 29, 1~31 Notary Public 81'10 18-a
I I
Attachment 1
PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2
and 3
DOCKET NUMBERS STN 50-528, STN 50-529 and STN 50-530 UALITY ASSURANCE PROGRAM FOR FIRE PROTECTION REQUEST FOR ADDITIONAL INFORMATION 3.
In Part III, Position A.l., you state that overall respon-sibility for the fire protection will be assigned to the Palo Verde Nuclear Generating Station Plant Manager.
This is an on-si'te position.
Describe the upper level off-site management position which will have overall responsS~
S>> ty for the formulation and implementation of the Fire Pro-tection Program.
~Res onse'he off-site upper level management position is the Vice Presiient oF Electric Operations who has the overall responsibility for the formulation and implementation of the Fi're Protection Program.-
t l
RFG'JLATORY INFORMATION DISTRIBUTION SgTE!( (RIDE)
ACCI=.SS ION N'IR-7812110126 DOC.DATF: 78/I I /30 NOTAR I Z D-yPS FWCIL:STN PALO VERDE 0 I, ARIZONA PUBLIC SERVICE CO.
STN
.~ PALO VERDE 42, ARI ZONA PUBLIC SFRVICE CO.
STN-50-530 PALOVFRDE )Ii3, ARIZONA PUBLIC SERVICE CO.
AUTH. iVAMF.
AUTHOR AFFILIATIOV VAN BRiJNT E ~ E ~
AZ PUB SVC RECI P. NA)4F REC I P I EiVT AFF I LI ATION BOYD, R. S.
- DIV.
OF PRO J FCT
%SNAG FME!VT SiJBJECT-Forwai-ds acfdl info reaueste6 in 781114 meeting re Q!iality Assurance Prop for fire Protec,which will also be incl in next a~end to FiT.e Protec Eval.
DISTRIBUTION CODE:
BOORS COPIES RFCEI YFD:LTR I
ENCL I
SIZE:
TITLE: FIRE PROTECTION (PRIOR TO ISS(!ANCE OF OL>.
IIOTES DoCKET 4.
05000528
~
05000529 05000530 R EC I P I E!'IT ID CODE/NA,ME ACTI()N-'5 BC LWR83 LA Lmu)3 I NTERNAL: 0 ~kEQ=ELLF 07 I8E 11 AUXIL SYS BR 14 HANAUER DIRECTOR DPM MURANAKA,R.
VASSALLO COP IES LTTR EiVCL 01 01 I
0 01 01 03 03 2
2 I
I I
0 I
0 I
0 REC I P I EiVT ID CODE/NAMF 06 Pq STRIGHT 02 I'IRC PDR 10 AD PLANT SYS 13 GAB AD FOR QA8, o I8,C SYS BR OELD YoUNG,D.E.
COPIES LTTR FNCL 01 Ol 0 I 01 01 01 I
I I
0 I
0 I
0 I
0 FXTEQNAL: 03 LPDR 01 OI J'l5 P'IR SYS BR ()d't~~l)
I
+8 OPFR LIC BPI~mh.gl I
MD SYS A PRO+iW&W~)
0 04 NS IC I
I H6 PLANT SYS B(INY)
?
?
19 ACRS 16 16 NI RFCTOR DOR('I~SFNA~)
0
" 13 1978 TOTAL NUi~BER OF COP,IES REQU IRFD:
LTTR 44 ENCL 34
fEGULATOHYDQCf<ET FILE COPY P
b WWZm BO CKOHIWRIZW P. O. BOX 2I666
'HOENIX, ARIZONA 65036 November 30, 1978 ANPP-12205-JMA/WFg Director of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Roger S.
Boyd, Director Division of Project Management Re:
Palo Verde Nuclear Generating Station Units 1, 2
8 3
Docket Numbers:
STN.-50-528/529/530 File:
78-054-026
Dear Sir:
As discussed in the meeting on November 14, 1978 between members of the NRC staff and Arizona Public Service, we are submitting
- herewith, as Attachment 1, the additional information relating to the guality Assurance Program for Fire Protection (NRC guestion f3).
This information will also be included in the next amendment to Fire Protection Evaluation.
Sincerely, ALAN E.
E.
Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director On its own behalf and as Agent for all other joint applicants.
STATE OF ARIZONA
)
ss County of Maricopa
)
Subscribed and sworn to me this ~C'ay of November, 1978.
My Commission Expires:
,Ey C...: -'...
flag Pep mimi'eg ugIy tege 29 I ~'31 Notary Public
Attachment 1
PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2 and 3
DOCKET NUMBERS STN 50-528, STN 50-529 and STN 50-530 UALITY ASSURANCE PROGRAM FOR FIRE PROTECTION REQUEST FOR ADDITIONAL INFORMATION 3.
In Part III, Position A.l., you state that overall respon-sibility for the fire protection will be assigned to the Palo Verde Nuclear Generating Station Plant Manager.
This is an on-site position.
Describe the upper level off-site management position which will have overall respons~SS>> ty for the formulation and implementation of the Fire Pro-tection Program.
~Res onse The off-site upper level management position is the Vice Pres'iient o7 Electric Operations who has the overall responsibility for the formulation and implementation of the Fire Protection Program.
jl
)
)
)
}
i
)
1
)
REGULATORY INFORMATION DISTRIBUTION S TEM (BIDS)
ACCI=.SSION NRR-7812110126 DOC.DATF.- 78/11/30 NOTARIZ D-'gS F'(i(.CIL:STN-50-528 PALO VERDE 0 I, ABIZONA PUBLIC SERVICE CO.
STN-50-5~>-
ITALO VERDF P2, ARI ZONA PUBLIC SFBVICF.
CO ~
ST. M3
- PALOVFRDE t3, ARIZ()NA PUBLIC SERVICE CO.
AUTH. IVAthF.
AUTHOR AFFILIATION VAN BRUNT,E.F.
AZ PUB SVC BECI P - NAW F REC I P IFiVT AFF I LIATION BOYD,R.S ~
- DIV. OF PROJFCT 8ANAGFMENT
SUBJECT:
Forwards acfdl info I eaueste6 in 781114 meeting re Qual itv Assurance Prog for fire Protec,which will also he incl in next amend to Fire Protec Fval.
DISTRIBUTIO(( CODE:
)
FNCL I
SIZEL TITLF.: FIRE PROTFCTI ON (PRIOR TO ISSUANCE OF OL).
NOTES:
DOCI(:ET 05000528 05000529 05000530.
B EC I P I ENT ID CODE/NAME ACTION-05 3C LWR83 LA LWN33 I NTFR NAL:
I~~EG F I L,F.
07 IBE 11 AUXIL SYS BR 14 HANAUER DIRECTOR DPM MURANA<A,B.
VASSALLO COP I ES LTTR ENCL 01 01 I
0 01 Ol 03 03 2
2 I
I I
0 0
I 0
COPIES LTTB FNCL 01 Ol 02 NBC PDR 10 AD PLANT 13 QAB AD FOB QA 8,
IBC SYS BB OELD YOUNG,D.F.
Ol SYS 01 I
0 I
I I
I 01 01 I
0 0
0 0
BEC I PI ENT I D CODE/NAIF.
06 pq STRIGHT FXTEBNAI ! 03 LPDR Ol Ol A5 Pi'IB SYS BR (IiA)$~bl I
g8 OPER LIC BQI I
I MD SYS
(( PRO+j~FNy()
0 04 NS IC I
<6 PLANT SYS B((A)Y)
?
19 ACRS Ih NIRFCTOR DOR()rP(SFNA<)
I 16 0
~g (Sly TOTAL NUMBFR OF COPIES REQU IBFD: LTTR 44 ENCL 34
1,
REGULATORY DOCI(ET FILE COPY j
cs o
PElXQaK ClOEMMV P. O BOX 2I666 PHOENIX, ARI2ON* SSO36 November 30, 1978 ANPP-12205-JMA/WFQ Director of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Roger S.
Boyd, Director Division of Project Management Re:
Palo Verde Nuclear Generating Station Units 1, 2
8 3
Docket Numbers:
STN;-50-528/529/530 File:
78-054-026
Dear Sir:
As discussed in the meeting on November 14, 1978 between members of the NRC staff and Arizona Public Service, we are submitting
- herewith, as Attachment, 1, the additional information relating to the Quality Assurance Program for Fire Protection (NRC Question f3).
This information will also be included in the next amendment to Fire Protection Evaluation.
Sincerely, 4LQ E.
E.
Van Brunt, Jr.
APS Vice President, Nuclear Projects ANPP Project Director On its own behalf and as Agent for all other joint applicants.
STATE OF ARIZONA ss Qd County of Maricopa
)
Qq Subscribed and sworn to me this ~C~
day of November, 1978.
My Commission Expires:
Ãiy C I-:-.~-~ "-~n';;-.- J;n
~9 IC'Q$
C 4..
Notary Public V812130 g c
I I
I II I ]
Attachment 1
PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2 and 3
DOCKET NUMBERS STN 50-528, STN 50-529 and STN 50-530 UALITY ASSURANCE PROGRAM fOR FIRE PROTECTION REQUEST FOR ADDITIONAL INFORMATION 3.
In Part III, Position A. 1., you state that overal'l respon-sibility for the fire protection will be assigned to the Palo Verde Nuclear Generating Station Plant Manager.
This is an on-si'te position.
Describe the upper level off-site management position which will have overall response Ss
>ty for the formulation and implementation of the Fire Pro-tection Program.
~Res onse The off-site upper level management position is the Vice pres'iient oF Electric Operations who has the overall responsibility for the formulation and implementation of the Five Protection Program.
gl