APPENDIX A Arizona Public Service Company P. 0.

Box 21666 Phoenix, Arizona.

85036 Docket No. 50-528 NOTICE OF VIOLATION Based on the results of the inspection conducted on July 17-21, 1978, it appears that certain of your activities were not conducted in full compliance with NRC requirements as indicated below.

On July 19 and 20,

1978, NRC inspectors examined Unit 1 post-tensioning trumplate and sheathing installation and inspection activities.

The following conditions were identified:

1.

Bechtel Work Plan Procedure/guality Control Instruction No. 66, Rev. 2, "Post-tensioning Trumplate and Sheathing Installation and Inspection," provides for accomplishing work in accordance with specified procedures, instructions, and drawings, as required by.10 CFR 50; Appendix B, Criterion V, tive PSAR Section 17.1A.5, and the Palo Verde Nuclear. Generating Station guality Assurance manual Chapter 5, all entitled "Instructions,, Procedures, and Drawings."

Contrary to these requirements, the following examples of non-conforming work were observed:

A.

B.

C.

D.

Vertical and horizontal tendon sheaths installed for placement No.

1C109 were wire tied at intervals greater than the maximum interval of 3'6", specified in WPP/gCI 66.

Six trumplate extensions were found to be unwired at their ends contrary to the requirements of WPP/gCI 66.

Two vertical sheaths (the 17th and 19th clockwise from the center of the equipment hatch) were found to be out of align-ment by 2" in 10 feet, whereas drawing 13-C-ZCS-175, Rev.

2, DCN 1 specifies-a maximum misalignment of 3/4" in 10 feet.,

Horizontal sheaths above the equipment hatch were found to be within 1-1/2" of each other, whereas drawing 13-C-ZCS-175, Rev. 2, DCN 1 specifies a minimum clearance of 3" in this area.

This is an infraction.

I I

Appendix A Arizona Public Service Company Docket No.

528 2.

Bechtel Work Plan Procedure/guality Control Instruction No. 66, Rev.

2, "Post-tensioning trumplate and Sheathing Installation and Inspection," provides for the performance of acceptance inspections, as required by 10 CFR 50. Appendix B, Criterion X, the Palo Verde Nuclear Generating Station guality Assurance Manual Chapter 10, and the PSAR Section 17.1A.10, all entitled "Inspection."

Contrary to these requirements, mandatory inspection hold points for the drilling of sheathing vent holes, installation of vent piping, wiring of sheathing, and positioning of sheathing were performed in a random sampling manner instead of the full coverage, required by WPP/gCI 66.

This is an infraction.

Bechtel Work Plan Procedure/guality Control Instruction No. 66, Rev. 2, "Post-tensioning Trumplate and Sheathing Installation and Inspection," provides for properly documenting and dispositioning nonconformances, as required by 10 CFR 50, Appendix B, Criterion XV, the Palo Verde Nuclear Generating Station guality Assurance Manual Chapter 15, and the PSAR Section 17.1A.15, all entitled "Nonconforming Materials, Parts, or Components."

Contrary to these requirements, records for sheathing installed for concrete placement 1C108 indicate a Nonconformance Report was not issued for the existing abrupt alignment change in vertical tendon sheath V-79.

This is an infraction.

4.

The APS gA program as set forth in the PSAR Section 17.1A.17 and the Palo Verde Nuclear Generating Station guality Assurance Manual Chapter 17, both entitled "guality Assurance Records," establishes requisites for developing and maintaining sufficient records to provide evidence of activities affecting quality, as required by 10 CFR 50 Appendix B, Criterion XVII.

l

Appendix A Arizona Public Service Company Docket No.

528 Contrary to these requirements, sufficient quality assurance records were not maintained as indicated below:

A.

As indicated in 2 above, mandatory inspection hold points were inspected in a sampling manner, instead of 100Ã inspection.

No quality records,

however, were maintained for even the sampling inspections, which would identify items inspected, and the date and results of inspections.

B.

Records for inspections of trumplate installation for concrete placement 1C108 were not signed off by guality Control Engineers prior to the placement of concrete.

This is a deficiency.

l 0