ML17292B729
| ML17292B729 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/13/1999 |
| From: | Pellet J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17292B730 | List: |
| References | |
| 50-397-99-05, 50-397-99-5, NUDOCS 9907190177 | |
| Download: ML17292B729 (6) | |
See also: IR 05000397/1999005
Text
CATEGORY 2
- ~
REGULATORY INFORMATION DISTRIBUTION SYSTEM
(RIDS)
CESSION NBR:9907190177
DOC.DATE: 99/07/13
NOTARIZED: NO
ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
AUTH.NAME
AUTHOR AFFILIATION
PELLET,Z.L.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/99-05
on 990607-11.No violations
noted.
DISTRIBUTION CODE: IEOIF
COPIES
RECEIVED LTRI ENCL i SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET
05000397
RECIPIENT
ID CODE/NAME
LPD4-2
COPIES
LTTR ENCL
1
1
RECIPIENT
ID.CODE/NAME
CUSHING,J
COPIES
LTTR ENCL
1
1
INTERNAL: ACRS
DEDRO
NRR/DIPM/IIPB
NRR/DRIP/REXB
RGN4
FI LE
0 1
2
2
1
1
1
1
1
1
1
1
1
1
AE
J
~ILE CENTE~
NRR/DIPM/OLHP
NUDOCS-ABSTRACT
OGC/RP
1
1
1
1
1
1
1
1
1
1
ERNAL: LMITCO MARSHALL
NRC PDR
1
1
1
1
NOAC
NUDOCS FULLTEXT
1
1
1
1
0
P9@G;=~gq
CTPwPP jlL
E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
18
ENCL
18
qi<<ac~
(4
~o
n0C
O
uh
Ol
Vr+n
~O
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZADRIVE, SUITE 400
ARLINGTON,TEXAS 760114064
July 13,
1999
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
SUBJECT:
NRC INSPECTION REPORT NO. 50-397/99-05
Dear Mr. Parrish:
This refers to the special inspection conducted on June 7-11, 1999, at the Washington Nuclear
Project-2 facility. The purpose of this inspection was to followup on the operations corrective
action program related to operator control board awareness
and critical parameter identification
and trending. The enclosed report presents the <<esults of this inspection.
In NRC Plant Performance Review letter of March 19, 1999, the NRC identified continuing
concerns with corrective actions not being effective in improving the operator's response to
nonroutine events and stated that a regional initiative inspection in this area was planned.
During this special inspection, the inspectors verified that your operations corrective action
program is addressing the aforementioned issues.
The inspectors concluded that while
operator performance is improving, continuing improvement is heeded to achieve your
expectations for level of performance.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure willbe placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we willbe pleased to discuss them
with you.
Sincerely,
John L. Pellet, Chief
Operations Branch
Division of Reactor Safety
Docket No.:
50-397
License No.:
Enclosure:
NRC Inspection Report No.
50-397/99-05
qq07190i77
99070i03q7
'PDR
ADQCK 050
6
)
Washington Public Power Supply System
-2-
cc w/enclosure:
Chairman
'nergy
Facility Site Evaluation Council
P.O. Box 43172
Olympia, Washington
98504-3172
Mr. Rodney L. Weibring (Mail Drop PE08)
Vice President, Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
Vice President, Generation
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. D. W. Coleman (Mail Drop PE20)
Manager, Regulatory Affairs
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Perry D. Robinson, Esq.
Winston 8 Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
Bob Nichols
Executive Policy Division
Office of the Governor
P. O. Box 43113
Olympia, Washington
98504-3113
Washington Public Power Supply System
-3-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
Resident Inspector
DRP Director
RIV File
DRS Director
RITS Coordinator
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:QWN2<WN905rp.tom.wpd
To receive co
of document, Indicate In box: "C" = Co
without enclosures
"E" ~ Co
viith enclosures "N" = No co
RIV:OB:SRE
TOMcKe mon/Im
07
/99
RI:PBE
JS
ets
07/
99
C:PBE
C:OB
LSmith
JLPellet
07
99
07/
9
OFFICIALRECORD COPY
C:OB
JLPellet
07/
99
Washington Public Power Supply System
-3-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report'to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
Resident Inspector
DRP Director
RIV File
DRS Director
RITS Coordinator
Branch Chief (DRP/E)
Senior Project Inspector (DRP/E)
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:QWN2EWN905rp.tom.wpd
To recehre co
ot document, Indicate In box: C" a Co
without enctosures
E" a Co
with enclosures "N" ~ No co
RIV:OB:SRE
TOMcKemon/Im
07
/99
Rl:PBE
JS
ets
07/
99
C:OB
JLPellet
07/
9
C:PBE
LSmith
07
99
C:OB
JLPeliet
07/
99
OFFICIALRECORD COPY