Amend 156 to License NPF-21,revising TS SR 3.8.1.8 to Remove Restriction on Testing of Manual Transfer Between Startup & Backup Offsite Power Sources While in Modes 1 or 2
ML17292B538
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/27/1999
From: Poslusny C
NRC (Affiliation Not Assigned)
To:
Shared Package
ML17292B539 List:
References
NUDOCS 9902020401
Download: ML17292B538 (8)


Text

~

~8 REIIy

~4 cE

~o O

I O~

4~

gO

~+*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205S~ON WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 NUCLEAR PROJECT N

. 2 MENDMENTTO FACILITYOPERATING LICENSE Amendment No. 156 License No. NPF-21 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Washington Public Power Supply System (licensee) dated December 17, 1998, as supplemented by letter dated January 21, 1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facilitywilloperate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities willbe conducted in compliance with the Commission's regulations; D.

The issuance of this amendment willnot be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-21 is hereby amended to read as follows:

990202040K 990i27 PDR ADQCK 08000397 P

PDR

)

cr

'r h

fi

',,l

~

~

I

~

~

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No'. 156 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This amendment is effective as of its date of issuance and shall be implemented within 30 days of its date of issuance.

FOR THE NUCLEAR REGULATORYCOMMISSION Q ~92.W Chester Poslusn Sr., Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of issuance:

January 27, 1999

~

~

TTACHMENTTO LICENSE AMENDMENT AMENDMENTNO. 156 TO FACILITYOPERATING LICENSE NO. NPF-21 DOCKET NO. 50-397 Replace the following page of the Appendix ATechnical Specifications with the enclosed page.

The revised page is identified by amendment number and contains vertical lines indicating the areas of change.

REMOVE 3.8-8 INSERT 3,8-8

~

~

AC Sources-Operating 3.8. 1 e

SURVEILLANCE RE UIREMENTS continued SURVEILLANCE FREQUENCY SR 3.8.1.7 S

~amawmmaaumamaanma~NOTE~mmmmmmmmammmiwmamma All DG starts may be preceded by an engine-prelube period.

'erify each required'DG starts from standby condition and achieves:

184 days a.

For DG-1 and DG-2 in s 15 seconds, voltage a 3910 V and frequency a 58.8 Hz, and after steady state conditions are reached, maintains voltage a 3910 V and a 4400 V and frequency a 58.8 Hz and a 61.2 Hz; and b.

For DG-3, in s 15 seconds, voltage a 3740 V and frequency a 58.8 Hz, and after steady state conditions are

reached, maintains voltage a 3740 V

and c 4400 V and frequency a 58.8 Hz and s 61.2 Hz.

SR 3.8.1.8

-NOTE The automatic transfer function of this Surveillance shall not be performed in MODE 1 or 2.

However, credit may be taken for unplanned events that satisfy this SR.

Verify automatic and manual transfer of the power supply to safety related buses from the startup offsite circuit to the backup offsite circuit.

24 months (continued)

WNP-2 3.8-8 Amendment No. 449,156

~

~

~

f 1