CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
E
ACCESSION NBR:9706190240
DOC.DATE: 97/06/16
NOTARIZED: NO
DOCKET I
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
Region
4 (Post
820201)
ECIP.NAME
RECIPIENT AFFILIATION
ARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/97-09
on 970413-0524
& NOV.
DISTRIBUTION CODE:
IE01F
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
F LE CENTER
NRR DRCH HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
EXTERNAL
LITCO BRYCEiJ
H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
COLBURNiT
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1,
1
1
1
1
1
1
1
0
R
0
LOAOEO FRee
, NRC FLOPPY
N
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION Iv
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
JUN
I 6 l997
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
SUBJECT:
NRC INSPECTION REPORT 50-397/97009 AND NOTICE OF VIOLATION
Dear Mr. Parrish:
An NRC inspection was conducted April 13 through May 24, 1997, at your Washington
Nuclear Project-2 (WNP-2) reactor facility. The'enclosed
report presents the scope and
results of that inspection.
During the inspection period, your conduct of licensed activities at WNP-2 was generally
characterized
by safety-conscious
operations
and maintenance
and good radiological
control practices.
One violation was identified during our review of Licensee Event
Report 94-04.
Specifically, it was concluded that Technical Specification action
requirements
were not followed when your staff determined that two main steam drain line
isolation valves were inoperable.
The recent engineering evaluation of past operability of
these valves was identified by the NRC to be weak in that all possible break locations had
not been considered
indicating a need for more thorough engineering
analyses.
In two instances we note that contractor control was inadequate
when work was
performed on an incorrect emergency diesel generator (although already out of service) and
a craftsman and a supervisor failed to understand
foreign material control provisions in
administrative procedures.
We noted past issues with the control and oversight of
contractors
in the adjustable speed drive work activities.
Your continued attention to
contractor oversight is encouraged.
The violation is cited in the enclosed
Notice of Violation (Notice) and the circumstances
surrounding this violation are described
in detail in the enclosed report.
The NRC has
concluded that information regarding the reason for the violation, the corrective actions
taken and planned to correct the violation and prevent recurrence
are already adequately
addressed
on the docket in the enclosed
inspection report.
Therefore, you are not required
to respond to this letter unless the description therein does not accurately reflect your
corrective actions or your position.
In that case, or if you choose to provide additional
information, you should follow the instructions specified in the enclosed
Notice.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of this letter,
its enclosures,
and your response
will be placed in the NRC Public Document Room (PDR).
I
970b%90240 970bib
ADOCK 050003'II7
8
lllillljlllllllllllllllllllllllll
Washington Public Power
Supply System
-2-
To the extent possible, your response
should not include any personal privacy, proprietary,
or safeguards
information so that it can be placed in the PDR without redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
Thomas
P. Gwy n, Di ector
Division of Reac or P ojects
Docket No.: 50-397
License No.:
Enclosures:
1.
2.
NRC Inspection Report
50-397/97009
cc w/enclosures:
Mr. Frederick S. Adair, Chairman
Energy Facility Site Evaluation Council
P.O. Box 43172
Olympia, Washington
98504-3172
Mr. Rodney L. Webring (Mail Drop PE08)
Vice President,
Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
E
Washington Public Power
Supply System
Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Perry D. Robinson,
Esq.
Winston 5 Strawn
1400 L Street, N.W.
D.C. 20005-3502
Washington Public Power
Supply System
-4-
JVN
j 6
lg97
report to T. Boyce (THB)
report to NRR Event Tracking System (IPAS)
report to Document Control Desk (DOCDESK)
report to Richard Correia (RPC)
report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:$ WN2)WN709RP.SAB
To receive copy of document, indicate In box: "C" = Copy without en
osures
"E" = Copy with enciosures "N" = No copy
RIV:SRI:DRP/E
SABoynton
06/ /97
Q/
C:DRP/E
HJWong
06/3/97
D:DRP
TPGwynn
06/
97
OFFICIAL RECORD COPY
Washington Public Power
Supply System
JUN
I 6 j997
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:i WN2iWN709RP.SAB
To receive copy of document,
indicate. ln box: "C" = Copy without en
osures
"E" = Copy with enclosures "N"= No copy
RIV:SR I:DRP/E
SABoynton
C:DRP/E
D:DRP
HJWong
~ TPGwynn
06/ /97
7KBI'6/3I'97
06/
97