UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 SOUTH CAROLINA ELECTRIC
& GAS COMPANY SOUTH CAROLINA PUBLIC SERVICE AUTHORITY DOCKET NO. 50-395 VIRGIL C.
SUMMER NUCLEAR STATION UNIT NO.
1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 127 License No. NPF-12 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by South Carolina Electric 8I Gas Company (the licensee),
dated June 19,
- 1995, as supplemented on August 21,
- 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; 2.
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No.
NPF-12 is hereby amended to read as follows:
95092i0051 9509i8'DR ADGCK 05000395 P
li I
~i l
I
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.
127 and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated in the license.
South Carolina Electric L Gas Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
'Frederick J.
Hebd n, Director Project Directorate II-I Div'ision of Reactor Projects I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 18, 1995
I I.
ATTACHMENT TO LICENSE AMENDMENT NO. 127 TO FACILITY OPERATING LICENSE NO.
NPF-12 DOCKET NO. 50-395 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revisions are indicated by marginal lines.
Remove Pa e
3/4 6-12 Insert Pa e
3/4 6-12
CONTAINMENT SYSTEMS 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS REACTOR BUILDINGSPRAY SYSTEM LIMITINGCONDITION FOR OPERATION 3.6.2.1 Two independent reactor building spray systems shall be OPERABLE with each spray system capable oftaking suction from the RWST and automatically transferring suction to the spray sump.
APPLICABILITY:MODES 1, 2, 3, and 4.
ACTION:
With one reactor building spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY withinthe next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the inoperable spray system to OPERABLE status withinthe next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWNwithinthe following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE RE UIREMENTS 4.6.2.1 Each reactor building spray system shall be demonstrated OPERABLE:
a.
Atleast once per 31 days by verifyingthat each valve (manual, power operated or automatic) in the flowpath that is not locked, sealed, or otherwise secured in position, is in its correct position.
b.
Byverifying, that on recirculation flow, each pump develops a discharge pressure ofgreater than or equal to 195 psig when tested pursuant to Specification 4.0,5.
c.
Atleast once per 18 months during shutdown, by:
1.
Verifyingthat each automatic valve in the flowpath actuates to its correct position on each ofthe followingtest signals a Phase 'A', Reactor BuildingSpray Actuation, and Containment Sump Recirculation.
2.
Verifyingthat each spray pump starts automatically on a Reactor BuildingSpray Actuation test signal.
d.
Atleast once per 10 years by performing an air or smoke or equivalent flowtest through each spray header and. verifyingeach spray nozzle is unobstructed, SUMMER - UNIT1 3/4 6-12 Amendment No.
127