ML17289A925

From kanterella
Jump to navigation Jump to search
Forward WNP-2 Simulator Certification NRC Form 474 Supporting Documentation Initial Certification Rept for Operator Training,Per 10CFR55.45(b)(1)(ii),(b)(3) & (b)(5)
ML17289A925
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/21/1992
From: Oxsen A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17289A926 List:
References
NUDOCS 9210210207
Download: ML17289A925 (6)


Text

acczr,aa.hrFO M~ maVrrOW OKMOws ~wrrOX SvSrZM REGULAT INFORMATION DISTRIBUTIO . STEM (RIDS)

ACCESSION NBR:9210210207 DOC.DATE: 92/10/21 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Publi Powe 05000397 AUTH. NAME AUTHOR AFFI'LIATION OXSEN,A.L. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Office of Nuclear Reactor Regulation, D rector (Post 870411

SUBJECT:

Forward "WNP-2 Simulator Certification NRC Form 474 Supporting Documentation" initial certification rept for operator training,per 10CFR55.45(b)(l)(ii),(b)(3) 6 (b)(5). I DISTRIBUTION CODE: B005D TITLE: Simulator COPIES RECEIVED:LTR Facility Certification Q ENCL g SIZE: OV p NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL DEANPW. 1 1 INTERNA NTRAL FILE 01 1 1 NRR/DLPQ/OLB 1 1 EXTERNAL: NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION S

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 4 ENCL 4

<<.l c~

~p

WASHINGTON PUBLIC POWER SUPPLY SYSTEiVI P.O. Box 968 ~ 3000 George Washington IVay ~ Richland, Washington 99352 Docket No. 50-397 Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 OPERATOR TRAINING SIMULATOR INITIALCERTIFICATIOi7 10 CFR 55.45 (b)(1)(ii), (b)(3) AND (b)(5)

References:

1) Letter dated March 26, 1991, P.L. Eng (NRC) to G.C. Sorensen (SS),

"Simulation Facility Certification"

2) Letter GO2-92-126, dated May 21, 1992, G.C. Sorensen to NRC, "Simulator Certification" The Washington Public Power Supply System (Supply System) in accordance with the requirements of 10 CFR 55.45 (b)(1)(ii), (b)(3) and (b)(5) submits the initial certification report for its Nuclear Plant No. 2 (Wl6'-2) operator training simulator. U.S. Nuclear Regulatory Commission (NRC) Form 474 "Simulation Facility Certification" is enclosed to certify that the WNP-2 simulator has been evaluated in accordance with the Nuclear Regulatory Commission's requirements for a plant-referenced simulator. In Reference 1, the Supply System was granted an exemption from the requirements of 10 CFR 55.45 (b)(2)(iii) allowing for the submittal of Form NRC-474 after the March 26, 1991 deadline provided in the rule, but no later than June 30, 1992.

This certification has been prepared in accordance with the subject Federal Regulation, the Nuclear Regulatory Commission's Regulatory Guide 1.149 and its reference ANSI/ANS-3.5 (1985) National Standard for Nuclear Power Plant Simulators for Use in Operator Training. Our submittal includes the completed NRC Form 474 and supporting documentation.

gOOOBi PDR APOCK 0 SOOO397 PDR

,ls 0

Director, Office of Nuclear Regulatory Commission Page 2 OPERATOR TRAINING SMULATOR INITIALCERTIFICATION This Simulation Facility Certification is submitted consistent with our communication with Nuclear Regulatory Commission staff (Reference 2). Per our communications, it was determined to certify the current simulator and, at a later date, submit a replacement certification for the new WNP-2 simulator now under construction.

Sincerely yours, A.L. Oxsen Deputy Managing Director (Mail Drop 387)

DWF:1am

Attachment:

as stated

" w/o attachments WM Dean, NRC JB Martin, NRC RV LF Miller, NRC NS Reynolds, W8cS DL Williams, BPA (399)

NRC Site Inspector (901A)

0 'C 1