GO2-92-126, Informs NRC That Form NRC-474 Certifying Existing WNP-2 Simulator Will Be Submitted Prior to 920630.Contractor Fabricating New Simulator Experiencing Delays.Util Prefers Recertification of Existing Simulator Over Addl Exemption

From kanterella
(Redirected from GO2-92-126)
Jump to navigation Jump to search
Informs NRC That Form NRC-474 Certifying Existing WNP-2 Simulator Will Be Submitted Prior to 920630.Contractor Fabricating New Simulator Experiencing Delays.Util Prefers Recertification of Existing Simulator Over Addl Exemption
ML17289A581
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/21/1992
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-92-126, NUDOCS 9206020134
Download: ML17289A581 (3)


Text

ACCELERATED DISTRIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~Pi ACCESSION NBR:9206020134 DOC.DATE: 92/05/21 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs NRC that Form NRC-474 certifying existing WNP-2 simulator will be submitted prior to 920630.Contractor fabricating new simulator experiencing delays. Util prefers recertification of existing simulator over addi exemption.

DISTRIBUTION CODE:

A005D COPIES RECEIVED:LTR J ENCL 8 SIZE:

TITLE: Simulator Facility Certification NOTES R

RECIPIENT ID CODE/NAME DEAN,W.

INTERNAL: C NTRAL

-L Ol EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME NRR/DLPQ/OLB COPIES LTTR ENCL D

R D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 4

ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 May 21, 1992 G02-92-126 Docket No. 50-397 9206020i34 9'2052i PDR ADOCK 05000397 P

PDR U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANTNO. 2, OPERATING LICENSE NPF-21, SIMULATOR CERTIFICATION

Reference:

a) b)

c) d)

Letter dated March 26, 1991, P.L. Eng (NRC) to G.C. Sorensen (SS),

"Schedular Exemption to 10 CFR 55.45(b)(2)(iii) for Simulation Facility Certification" Letter GO2-90-068, dated April 4, 1990, G.C. Sorensen (SS) to NRC, "Request for Exemption From 10 CFR 55.45(B)(2)(iii) Filing Deadline, and 10 CFR 55.45 (b)(2)(iv)"

Letter G02-91-209, dated November 15, 1991, G.C. Sorensen (SS) to P.L. Eng (NRC), "Meeting to Discuss Simulator Status" Letter dated February 26, 1992, A.W. Dromerick (NRC) to GPU Nuclear and Washington Public Power Supply System, "Summary of Audit" In Reference (a), the U.S. Nuclear Regulatory Commission (NRC) granted the Washington Public Power Supply System (Supply System) an exemption from the requirements of 10 CFR 55.45(b)(2)(iii) which would allow for the submittal of Form NRC-474 "Simulation Facility Certification" after the March 26, 1991 deadline provided in the rule, but no later than June 30, 1992.

This exemption was issued in response to an application for exemption submitted by the Supply System (Reference b).

As the NRC staff is aware, from discussions and meetings which have taken place over the past year (References c and d), the contractor fabricating the new WNP-2 simulator is experiencing delays and the simulator will not be complete and available for use at WNP-2 prior to the expiration of the exemption.

The Supply System has evaluated the options and has determined that the most prudent course of action at this point is to certify the existing WNP-2 simulator as an interim step until the new simulator is delivered and installed. We believe that this course of action is preferred over requesting an additional exemption because it (1) keeps the Supply

~ QAOp)g ll I

)

F 1

oo~

i

NRC Document Control Desk

'Page two May 21, 1992 SIMULATORCERTIFICATION System's training facilities within the regulations and (2) the existing simulator has been demonstrated to be an effective training and evaluation tool.

Prior to June 30, 1992, the Supply System willsubmit Form NRC-474 certifying the existing WNP-2 simulator.

While the simulator is an effective training and evaluation tool, we expect that there willbe some areas where itwillbe necessary for us to take exception to the guidance provided in ANSUANS 3.5, as endorsed by Regulatory Guide 1.149.

Justification for any exceptions willbe provided as required.

While the new simulator has been under development, the Supply System has continued to make improvements to the existing simulator in order to enhance its effectiveness as a training and evaluation tool. This process willcontinue as long as the existing simulator is being used.

We expect that the new simulator willbe installed and available for use at WNP-2 by mid-1993.

This is, of course, dependent upon the contractor being able to meet established schedule milestones.

Should you have any questions, please contact me at (509) 372-5238 or Mr. David Fraley at (509) 377-8166.

Sincerely, G.C. So ensen, Manager Regulatory Programs (Mail Drop 280)

GCS:sn CC:

WM Dean, NRC NK Hunemuller, NRC JB Martin, NRC RV LF Miller, NRC RV NS Reynolds, Winston & Strawn DL Williams, BPA (399)