ML17289A917
| ML17289A917 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/06/1992 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17289A918 | List: |
| References | |
| NUDOCS 9210190028 | |
| Download: ML17289A917 (3) | |
Text
19<c Docket No. 50-397 Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way
- Richland, Washington 99352 Attention:
Mr.
G.
C. Sorensen, Hanager Regulatory Programs
SUBJECT:
FEMA FINAL REPORT FOR HAY 9,
- 1992, KIONA-BENTON EMERGENCY WORKER/ASSISTANCE CENTER DRILL By letter dated September 11, 1992, the Federal Emergency Management Agency (FEMA) informed the NRC of the results of their observations of the Hay 9, 1992, Kiona-Benton Emergency Worker/Assistance Center drill.
The letter states that no deficiencies were identified during the drill.
- However, seven Areas Requiring Corrective Action (ARCAs) and four Plan Issues were identified.
Copies of the FEHA letter and report are enclosed.
We request that you follow up with offsite officials on the ARCAs and Plan Issues.
Sincerely, Robert J.
- Pate, Chief Safeguards, Emergency Preparedness, and Non-Power Reactor Branch cc w/o enclosures:
J.
W. Baker, WNP-2 Plant Manager A.
G. Hosier, WNP-2 Licensing Manager L. L. Grumme, Acting Director, Licensing 8 Assurance G.
E.
- Doupe, Esq.,
WPPSS A. L. Oxsen, Deputy Managing Director J.
V. Parrish, Assistant Managing Director for Operations State of WA M. H. Philips, Esq.
T. Strong',
WA State Department of Health, Office of Radiation Protection
'R.
- Donovan, FEMA, Region X
bcc w/enclosures:
EP File 123 Central Files..:, ~ -.:;
, illt l) ~
>2101>00 pppptp7 921006 PDR ADOCV, 05 F
bcc w/o enclosures:
R. Erickson, NRR/PEPB RV/GND R
VEST COPY REO T
E+SNO m(~
YES NO Good (~t c'Ku i
10/7/92 10/q /92 RE(VEST COPY XND TO PDR YES/NO~ /ting YES+0 RPate KP'<
-10/ q/92
I t