ML17286B258
| ML17286B258 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/03/1992 |
| From: | Zimmerman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17286B259 | List: |
| References | |
| NUDOCS 9201220078 | |
| Download: ML17286B258 (6) | |
See also: IR 05000397/1991039
Text
C<~ ~~~>,.
c~
wp
Op
A
'I
/
+a**+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1460 MARIALANE, SUITE 210
WALNUTCREEK, CALIFORNIA64696-6366
l
January
3,
1991
Docket No.
50-397
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Hr.
G.
C. Sorensen
Nanager,
Regulatory
Programs
Gentlemen:
Subject:
NRC I'nspection
This refers to the inspection
conducted
by Hessrs.
R.
C. Sorensen
and
D. L. Proulx of this office on October
23 - December 8,
1991 of activities
authorized
by
NRC Operating
License No..NPF-21,
and to the discussion of
findings held by the inspectors
with Nr; J.
Baker and other members of the
Supply System staff at the conclusion of the ihspection.
S
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examina-
tions of procedures
and representative
records,
interviews with personnel
and
observations
by the inspectors.
Please direct your attention to paragraph
6.b.(6)
and
(10) of the enclosed
report; which describes
plant material condition
and housekeeping
deficiencies
noted during this inspection period.
Although none of these deficiencies
had
a direct impact
on plant safety,
we are concerned
about the need for
additional
management
attention to this area to avoid
a possible
adverse
effect on plant safety.
We also consider it appropriate to recognize the performance of your plant
operators
following the turbine trip, reactor
and Unusual
Event which
occurred
on November
19,- 1991.
Their communications,
use of emergency
operating procedures,
and professionalism
in placing the plant in a stable
condition were noteworthy.
No violations or deviations
were identified within the scope of this
inspection.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
R.
P.
Zimmerman,
Dirhctor
Division of Reactor Safety
and Projects
9201220078
'F20103
ADOCN, 05000397
8
>FoI ](
0
]j
5
Enclosure:
Inspection
Report
No. 50-397/91-39
ccrc
A. L.
G.
D.
J.
W.
A.
G.
G.
E.
H. H.
State
Oxsen,
Deputy Hanaging Director
Bouchey, Director, Licensing
and Assurance
Baker,
WNP-2 Plant Hanager
Hosier.,
WNP-2 Licensing Hanager
Doupe,
Esq.
Phillips, Winston 5 Strawn
of Washington
0
0
bcc w/copy of enclosure:
Docket File
Project Inspector
Resident
Inspector
B. Faulkenberry
J. Hartin
P. Johnson
R.
Huey
.
P.
Eng,
G.
Cook
bcc w/o enclosure:
H. Smith
J.
Bianchi
J. Zollicoffer
REGION
V
0
x
~
en
+~1/g
92
Ii~92
P hsn
1/
2
S
c
ds
I/9
2
KPer
I/9 /92
YES
NO
Q
NO
YES
NO
NO
'
NO
YES
NO
~
l
f
f