Forwards Insp Rept 50-397/91-39 on 911023-1208.No Violations or Deviations Identified.Deficiencies in Plant Matl Condition & Housekeeping Noted
ML17286B258
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/03/1992
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17286B259 List:
References
NUDOCS 9201220078
Download: ML17286B258 (6)


See also: IR 05000397/1991039

Text

C<~ ~~~>,.

c~

wp

Op

A

'I

/

+a**+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1460 MARIALANE, SUITE 210

WALNUTCREEK, CALIFORNIA64696-6366

l

January

3,

1991

Docket No.

50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Hr.

G.

C. Sorensen

Nanager,

Regulatory

Programs

Gentlemen:

Subject:

NRC I'nspection

This refers to the inspection

conducted

by Hessrs.

R.

C. Sorensen

and

D. L. Proulx of this office on October

23 - December 8,

1991 of activities

authorized

by

NRC Operating

License No..NPF-21,

and to the discussion of

findings held by the inspectors

with Nr; J.

Baker and other members of the

Supply System staff at the conclusion of the ihspection.

S

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examina-

tions of procedures

and representative

records,

interviews with personnel

and

observations

by the inspectors.

Please direct your attention to paragraph

6.b.(6)

and

(10) of the enclosed

report; which describes

plant material condition

and housekeeping

deficiencies

noted during this inspection period.

Although none of these deficiencies

had

a direct impact

on plant safety,

we are concerned

about the need for

additional

management

attention to this area to avoid

a possible

adverse

effect on plant safety.

We also consider it appropriate to recognize the performance of your plant

operators

following the turbine trip, reactor

scram,

and Unusual

Event which

occurred

on November

19,- 1991.

Their communications,

use of emergency

operating procedures,

and professionalism

in placing the plant in a stable

condition were noteworthy.

No violations or deviations

were identified within the scope of this

inspection.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

R.

P.

Zimmerman,

Dirhctor

Division of Reactor Safety

and Projects

9201220078

'F20103

PDR

ADOCN, 05000397

8

PDR

>FoI ](

0

]j

5

Enclosure:

Inspection

Report

No. 50-397/91-39

ccrc

A. L.

G.

D.

J.

W.

A.

G.

G.

E.

H. H.

State

Oxsen,

Deputy Hanaging Director

Bouchey, Director, Licensing

and Assurance

Baker,

WNP-2 Plant Hanager

Hosier.,

WNP-2 Licensing Hanager

Doupe,

Esq.

Phillips, Winston 5 Strawn

of Washington

0

0

bcc w/copy of enclosure:

Docket File

Project Inspector

Resident

Inspector

B. Faulkenberry

J. Hartin

P. Johnson

R.

Huey

.

P.

Eng,

NRR

G.

Cook

bcc w/o enclosure:

H. Smith

J.

Bianchi

J. Zollicoffer

REGION

V

0

x

~

en

+~1/g

92

Ii~92

P hsn

1/

2

S

c

ds

I/9

2

KPer

I/9 /92

YES

NO

Q

ES

NO

YES

NO

ES

NO

'

NO

YES

NO

~

l

f

f