Forwards Mgt Meeting Rept 50-397/91-14 on 910502.Causes of Unsatisfactory Program Include:Operators Not Acceptably Proficient in Use & Did Not Consistently Adhere to EOPs
ML17286A777
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/16/1991
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17286A778 List:
References
NUDOCS 9105280015
Download: ML17286A777 (8)


See also: IR 05000397/1991014

Text

FORD

1

REGULATORY INFORMATION DISTR1BUTION SYSTEM (RIDS)

ACCESSION NBR:9105280015

DOC.DATE: 91/05/16

NOTARIZED: NO

DOCk,'.'+

=ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

050!~3)

~

~

~

~

AUTH.NAME

AUTHOR AFFILIATION

RTIN,J.B.

Region

5 (Post

820201)

ECIP.NAME

RECIPIENT AFFILIATION

MAZUR,D.W.

Washington Public Power Supply System

SUBJECT:

Forwards

mgt meeting rept 50-397/91-14

on 910502.Causes

of

unsatisfactory

program include:operators

not acceptably

proficient in use

& did not consistently

adhere

to EOPs.

DISTRIBUTION CODE: IE42D

COPIES

RECEIVED:LTR

ENCL

SIZE:

.ITLE: Operator

Licensing Examination Reports

NOTES:

RECIPIENT

D CODF/NAME

PD5

PD

INTERNAL: ACRS

NRR/DL7Q/AHFB11

REg ".%&iE

.

02

EXTERNAL: NRC

PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

RECIPIENT

ID CODE/NAME

ENG,P.L.

NRR SHANKMANrS

NRR/DLPQ/LOLB10

RGN5

FILE

01

NSIC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

C

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

11

ENCL

11

0

t

l'

t

f

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE, SUITE 210

WALNUTCREEK, CALIFORNIA94596

MAY i 6

1991

Docket No. 50-397

Washington Public Power Supply System

P. 0.

Box 968,

3000 George

Washington

Way

Rich1and,

Washington

99352

Attention: Hr. D.

W. Hazur,

Hanaging Director

SUBJECT:

SUHHARY OF NEETING BETMEEM NRC ANO WPPSS

ON HAY 2,

1991

AT WALNUT

CREEK,

CALIFORNIA (REPORT

NO. 50-397/91-14)

REFERENCE:

1)

Letter,

A. L. Oxsen to J.

B. Hartin, Unsatisfactory

Licensed

Operator Requalification Training Program

- Root Cause

Assessment

and Corrective Actions, dated April 15,

1991

This letter is to summarize

the meeting held in the

NRC Region

V office on Hay

2,

1991

between senior

NRC management

and Washington Public

Power Supply

System

management

(Enclosure '1).

As

a result of the discussions

which were held in that meeting concerning

the

recent requalification program failure,

we concluded that there

are two root

causes

for the unsatisfactory

program.

First, the operators

were not

acceptably proficient in the use of and did not consistently

adhere

to the

Emergency Operating

Procedures

(EOPs).

Second,

the training program did not

adequately

maintain the skills of the operating

crews during the

requalification training cycle.

From our discussions

and the Supply System's

presentation

of the

requalification examinatiog results, .it .appeared"to

us that your management

staff was not convinced that certain of your operators

performed

unsatisfactorily during the examination

and operational

evaluation.

Instead,

management

appeared

focused

on administration of the examination

as the basis

for the unexpected

poor performance

by the operators.

In particular,

the Supply System identified

a number of root causes

for their

unsatisfactory

program,

including:,

operator stress

due to rumors about the

upcoming

exam,

and unexpected

NRC changes

in scenario difficulty and the

examination process.

While these

concerns

deserve

evaluation,

they are s'eparate

from the

significant, central

safety concern that licensed

operators

at

WNP-2 did not

demonstrate

a firm commitment to using their EOPs,

and 'they have not been

adequately trained to do st

9105280015

91055 6

PDR

ADOCK 05000397

6

PDR

1

I

l

H

X

A followup meeting has been scheduled with senior Supply System

representatives

on May 20,

1991 at

1 p.m. in the Region

V offices

in Walnut Creek, California to discuss further what your current

perception is of the factors that led to the operator

and

training weaknesses

which frere observed,

and to discuss

your

detailed plans

and schedule for corrective action.

sincere y,

(

B. Martin

Regional Administrator

Enclosure:

(1)

Meeting Summary

cc w/enclosure

(1):

Mr. J.

W. Baker,

WNP-2 Plant Manager,

Mr. A.

G. Hosier,

WNP-2 Licensing Manager

Mr. G.

D. Bouchey, Director, Assurance

& Licensing

Mr. G.

E.

Doupe,

Esq.,

WPPSS

Mr. A. Lee Oxsen,

Deputy Managing Director

State of WA (Curtis Eschels)

Mr. M. H. Philips,

Esq.

Winston

& Strawn

1400 L Street,

NW

Washington,

D.C.

20005-3502

0

1

jl

bcc w/enclosure

(1):

B. Faulkenberry,

RV

R.

Zimmerman,

RV

K. Perkins,

RV

B. Gallo,

LOLB

D. Kirsch,

RV

L. Miller, RV

P. Johnson,

RV

T. Sundsmo,

RV

C. Sorenson,

SRI

P.

Eng,

NRR/PD5

R. Cross,

RV

Docket File

~gy ) 6

l991

bcc w/o enclosure

(1):

M. Smith

J. Zollicoffer

N. Western

I

h

t

f

t

t

~

i

,I