ML17286A563
| ML17286A563 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/23/1991 |
| From: | WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | |
| Shared Package | |
| ML17286A562 | List: |
| References | |
| NUDOCS 9101280207 | |
| Download: ML17286A563 (2) | |
Text
CONTROLLED COPY ADMINISTRATIVE CONTROLS UNIT STAFF (continued) 4.
Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.
Any deviation from the above guidelines shall be authorized by the Plant Manager or his deputy, or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation.
Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by the Plant Manager or his designee to assure that excessive hours have not been assigned.
Routine deviation from the above guidelines is not authorized.
l+eense; The Reactor Operators shall hold ei operator ther a senior reactor license or a reactor operator license.
Th.
s.L 9 l"U.
A4, igcrc <<~:
Co Iron ~
5 (er (
s
~~c (or' pcl~4P p
e ~('ops WASHINGTON NUCLEAR - UNIT 2
(
91012S0207 910123 PDR ADOCK 05000397 P
PDR Amendment No.
67
'0 e
W 4