Forwards Insp Rept 50-397/90-28 on 901022-1202.No Violations Noted.Two Issues Unresolved.Concern Re Weakness in Control of Maint Activities Discussed
ML17286A547
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/28/1990
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17286A548 List:
References
NUDOCS 9101150107
Download: ML17286A547 (6)


See also: IR 05000397/1990028

Text

pe REC0g

Wp0

>>>>*+~

Docket No.

50-397

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94595

DEC 28 ]990

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. G. C. Sorensen

Manager,

Regulatory

Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Messrs.

R.

C. Sorensen

and

D. L. Proulx of this office on October

22 - December 2,

1990 of activities

authorized

by NRC Operating License

No. NPF-21,

and to the discussions

of

findings held by the inspectors with Mr. J.

Baker and other members of the

Supply System staff at the conclusion of the inspection.

Areas examined during this inspection

are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

We are concerned

about

an observed;weakness

in your control of maintenance

activities,

as discussed

in paragraph

12 of the enclosed

report.

While we

recognize that this issue

was identified and corrected

by your staff, the

restoration of a containment isolation valve to an operable status without

its having properly met its stroke time specifications is

a potentially

serious

problem.

Your attention is invited to the lack of administra'tive

controls which permitted such

an action to be carried out on backshift

without input from Plant Technical or Generation

Engineet ing personnel.

This issue will be examined further during our next inspection period.

In accordance

with 10 CFR 2.790(a);

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

S.

Richards,

Chief

Reac or Projects

Branch

Enclosure:

Inspection

Report

No. 50-397/90-28

'F101150107

901228

PPP~

ADD>> I'",->P,I0>"? ~

G

PLII<

~Cc/

It

i

JS

1

'l

4

)

I

J

cc:

A. L. Oxsen,

Deputy Nanaging Director

G.

D. Bouchey, Director, Licensing

and Assurance

J.

W. Baker,

WNP-2 Plant Nanager

A. G., Mosler,

WNP-2 Licensing Nanager

G.

E. Doupe,

Esq.

N.

M. Philips, Esq.,

Winston

8 Strawn

State of Washington

-3-

bcc w/copy of enclosure:

Docket File

Project Inspector

Resident

Inspector

B. Faulkenberry

J. Martin

A. Johnson

P.

Johnson

P.

Eng,

NRR

G.

Cook

bcc w/o enclosure:

M. Smith

N. Western

J. Zollicoffer

REGION

V

0

o lx

6 12/

/90

QW 'G~r~&t'sen

Iz/K/~O

PJ

i

on

12/

/90

0%~

PHorri1 1

Q$R

ha

ds

12/Q/90

'W2/22/90

BLUEST COPY

J

+VEST

COPY

R

EST

COPY

REQUEST

ST

COPY

ES i /

NO

1

ES, /

NO

ES

g /

NO

YES /

NO

YES /

NO

S

TO PDR

ES /

NO