Text
pe REC0g
Wp0
>>>>*+~
Docket No.
50-397
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIALANE,SUITE 210
WALNUTCREEK, CALIFORNIA94595
DEC 28 ]990
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Mr. G. C. Sorensen
Manager,
Regulatory
Programs
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection
conducted
by Messrs.
R.
C. Sorensen
and
D. L. Proulx of this office on October
22 - December 2,
1990 of activities
authorized
by NRC Operating License
No. NPF-21,
and to the discussions
of
findings held by the inspectors with Mr. J.
Baker and other members of the
Supply System staff at the conclusion of the inspection.
Areas examined during this inspection
are described
in the enclosed
inspection report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
We are concerned
about
an observed;weakness
in your control of maintenance
activities,
as discussed
in paragraph
12 of the enclosed
report.
While we
recognize that this issue
was identified and corrected
by your staff, the
restoration of a containment isolation valve to an operable status without
its having properly met its stroke time specifications is
a potentially
serious
problem.
Your attention is invited to the lack of administra'tive
controls which permitted such
an action to be carried out on backshift
without input from Plant Technical or Generation
Engineet ing personnel.
This issue will be examined further during our next inspection period.
In accordance
with 10 CFR 2.790(a);
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
S.
Richards,
Chief
Reac or Projects
Branch
Enclosure:
Inspection
Report
No. 50-397/90-28
'F101150107
901228
PPP~
ADD>> I'",->P,I0>"? ~
G
PLII<
~Cc/
It
i
JS
1
'l
4
)
I
J
cc:
A. L. Oxsen,
Deputy Nanaging Director
G.
D. Bouchey, Director, Licensing
and Assurance
J.
W. Baker,
WNP-2 Plant Nanager
A. G., Mosler,
WNP-2 Licensing Nanager
G.
E. Doupe,
Esq.
N.
M. Philips, Esq.,
Winston
8 Strawn
State of Washington
-3-
bcc w/copy of enclosure:
Docket File
Project Inspector
Resident
Inspector
B. Faulkenberry
J. Martin
A. Johnson
P.
Johnson
P.
Eng,
G.
Cook
bcc w/o enclosure:
M. Smith
N. Western
J. Zollicoffer
REGION
V
0
o lx
6 12/
/90
QW 'G~r~&t'sen
Iz/K/~O
PJ
i
on
12/
/90
0%~
PHorri1 1
Q$R
ha
ds
12/Q/90
'W2/22/90
BLUEST COPY
J
+VEST
COPY
R
EST
COPY
REQUEST
COPY
ES i /
NO
1
ES, /
NO
g /
NO
YES /
NO
YES /
NO
S
TO PDR
ES /
NO