ML17286A347
| ML17286A347 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/02/1990 |
| From: | Richards S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17286A348 | List: |
| References | |
| NUDOCS 9010170145 | |
| Download: ML17286A347 (3) | |
See also: IR 05000397/1990021
Text
ACCELERATED'ISTRIBUTION DEMONSTRATION SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
SSION NBR:9010170145
DOC.DATE: 90/10/02
NOTARIZED: NO
CIL:50-. 397
WPPSS Nuclear Project, Unit 2, Washington Public Powe
AUTH.NAME
AUTHOR AFFILIATION
RICHARDS,S.A.
Region
5 (Post
820201)
RECIP:NAME
RECIPIENT AFFILIATION
SORENSEN,G.C.
Washington Public Power Supply System
DOCKET
05000397
SUBJECT:
Forwards Insp Rept 50-397/90-21
on 900730-0908.No violations
noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation
esponse
NOTES:
RECIPIENT
ID CODE/NAME
PD5
INTERNAL: ACRS
AEOD/DEIIB
DEDRO
NRR SHANKMAN,S
NRR/DREP/PEPB9D
NRR/DST/DIR 8E2
NUDOCS-ABSTRACT
OGC/HDS2
RGN5
FILE
01
EX ERNAL: NRC PDR
COPIES
LTTR ENCL
1
1
2'1
1
1
1'1
1
1
1
RECIPIENT
ID CODE/NAME
ENG,P.L.
AEOD/TPAD
NRR MORISSEAU,D
NRR/DLPQ/LPEB1 0
NRR/DRIS/ DIR
NRR/PMAS/ILRB1 2
0+EZR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
'
1
1
1
1
1
-1
. 1
1
1
1'OTE
TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,
ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
AL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
4
gag AECy
(4
'Ip.0
IlA0
+r+
+a*++
Docket No.
50-397
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIALANE,SUITE 210
WALNUTCREEK, CALIFORNIA94596
OCT -2 1990
Mashingt'on Public Power Supply System
P. 0.
Box 968
Richland, Mashington
99352
Attention:
Mr. G. C. Sorensen
Manager Regulatory
Programs
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection conducted
by Messrs.
C. J. Bosted
and
R.
C. Sorensen of this office on July 30 - September
8,
1990 of activities
authorized
by NRC Operating License
No. NPF-21,
and to the discussions
of
findings held by the inspectors with Mr. J.
M. Baker and other members of the
Supply System staff at the conclusion of the inspection.
Areas examined during this inspection are described
in the enclosed
inspec.-
tion report.
Within these areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel
and observations
by the inspectors.
No violations or deviations were identified within the scope of this
inspection.
In accordance with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincer ely,
Enclosure:
Inspection Report No. 50-397/90-21
S. A. Richards,
Chief
Reactor Projects
Branch
cc:
A. L.
G. D.
J.
W.
A. G.
G. E.
M. H.
State
Oxsen,
Deputy Managing Director
Bouchey, Director, Assurance
8 Licensing
Baker,
WNP-2 Plant Manager
Hosier,
WNP-2 Licensing Manager
Doupe,
Esq.
Philips, Esq.,
Winston
8 Strawn
of Washington
90i017014="i F01002
Poa
aDOCI: Oa0003>7
9
-2-
bcc w/copy of enclosure:
Docket File
Project Inspector
Resident
Inspector
B. Faulkenberry
J. Martin
A. Johnson
P. Johnson
P.
Eng,
G.
Cook
bcc w/o enclosure:
N. Smith
N. Western
J. Zollicoffer
REGIO '
re
en
10/ L/90
CBosted
10/
/90
P
h
on
10/ 2/90
SRichards
10/~90
PY
Q
NO
YES /
NO
YES /
NO
YES /
NO
S
Q TO
ES 3/
NO