CONTROLLED COPY INSTRUMENTATION 3/4.3.4 RECIRCULATION PUMP TRIP ACTUATIOH INSTRUMENTATION A'WS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION lIMITING CONDITION FOR OPERATION 3.3.4.1 The anticipated transient without scram recirculation pump trip (ATMS-RPT) system instrumentation channels shown in Table 3.3.4.1-1 shall be OPERABLE with their trip setpoints set consistent with values shown in the Trip Setpoint column of Table 3.3.4. 1-2.

APPLICABIlITY: OPERATIONAL CONDITION l.

ACTION:

'a 0 Mith an AVOWS-RPT system instrumentation channel trip setpoint less conservative than the value shown in the Allo~able -Values column of Table 3.3.4.1-2, declare the channel inoperable until the channel is restored to OPERABLE status with the channel trip setpoint adjusted consistent with the Trip Setpoint t- value+

b. the number of OPERABLE channels~rhqless 'ith than required by the Minimum OPERABLE Channels per Nip+stem requirement 4or one-4r-ip-p lt'.)

OPERABLE status within 14 da s ~be in at Bth<~ ega<,

least STARTUP within the".next hours.

4 or p4.c>> 6>>. )~o p>> >41>> c <<el(s) oP- I.;I;II .I"' k.:P as4 fh>>, 4 ~tp /~A cooJAi $ losJ ~ ~,'CIAO dAO>> kOWW ~$

SURVEILLANCE RE UIREMEHTS 4.3.4. 1. 1.. Each ATMS"RPT system instrumentation channel shall be demonstrated OPERABLE by -the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATIOH operations at the frequencies shown inTable 4.3.4. 1-1. '

1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation

'.3.4.

of all channels shall be performed at least once per 18 months.

':(9 l Cagg la q~4l>>. g 0 Pi~>> Mg '+~P<~<~~< 'c'4~u>>() ga lA ~+AD ~0& pc~ u 4 ~f() '4 p p p WASHINGTON NUCLEAR -, UNIT 2 3/4 3"37 90i0i50i38 90i004 PDR P

ADOCK 05000397 PDC

C' 1J V

If ~ ~

h

( ,lk t 1 I I ~ =, J' I Wt f

~ 4 4

~ 4

TABLE 3.3.4. l-l ATWS RECIRCULATION PUMP TfllP SYSTEM INSTRUMEHTATIOH TRIP FUNCTION 5 MINIMUM OPERABLE CHANNELS PER TRIP SYSTEM a Reactor Vessel Water Level-Low Low, Level 2

2. Reactor Vessel Pressure - High provided the other channel is OPERABLE.

4$ ~ g