Proposed Tech Specs 3.3.4 Re ATWS Recirculation Pump Trip Sys Instrumentation
ML17286A339
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/04/1990
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17286A338 List:
References
NUDOCS 9010150138
Download: ML17286A339 (4)


Text

- CONTROLLED COPY INSTRUMENTATION 3/4.3.4 RECIRCULATION PUMP TRIP ACTUATIOH INSTRUMENTATION A'WS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION lIMITING CONDITION FOR OPERATION 3.3.4.1 The anticipated transient without scram recirculation pump trip (ATMS-RPT) system instrumentation channels shown in Table 3.3.4.1-1 shall be OPERABLE with their trip setpoints set consistent with values shown in the Trip Setpoint column of Table 3.3.4. 1-2.

APPLICABIlITY:

OPERATIONAL CONDITION l.

ACTION:

'a 0 b.

p lt'.)

s ~be in at least STARTUP within Bth<~ ega<,

OPERABLE status within 14 da the".next hours.

Mith an AVOWS-RPT system instrumentation channel trip setpoint less conservative than the value shown in the Allo~able -Values column of Table 3.3.4.1-2, declare the channel inoperable until the channel is restored to OPERABLE status with the channel trip setpoint adjusted consistent with the Trip Setpoint value+

t-

'ith the number of OPERABLE channels~rhqless than required by the Minimum OPERABLE Channels per Nip+stem requirement 4or one-4r-ip-4 or p4.c>>

6>>.

)~o p>> >41>>

c

<<el(s) fh>>,

4 ~tp /~A cooJAi $ losJ ~

SURVEILLANCE RE UIREMEHTS oP-I.;I;II.I"'

k.:P as4

~,'CIAO dAO>>

kOWW ~$

4.3.4. 1. 1.. Each ATMS"RPT system instrumentation channel shall be demonstrated OPERABLE by -the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATIOH operations at the frequencies shown inTable 4.3.4. 1-1.

'.3.4.

1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.

':(9 l Cagg la q~4l>>.

g 0 Pi~>>

Mg lA~+AD

~0&

pc~ u 4

'+~P<~<~~< 'c'4~u>>() ga

~f()

p p '4 p

WASHINGTON NUCLEAR UNIT 2 90i0i50i38 90i004 PDR ADOCK 05000397 P

PDC 3/4 3"37

C' V

1J If

~

t

~

(

,lk 1

I h

I ~ =,

J' Wt I

~ 4 f

4

~ 4

TABLE 3.3.4. l-l ATWS RECIRCULATION PUMP TfllP SYSTEM INSTRUMEHTATIOH TRIP FUNCTION 5 Reactor Vessel Water Level-Low Low, Level 2

2.

Reactor Vessel Pressure

- High MINIMUMOPERABLE CHANNELS PER TRIP SYSTEM a provided the other channel is OPERABLE.

4$ ~

g