Advises That Util Request to Modify Tech Specs to State That Two Operable Channels Per Trip Sys Required for Each ATWS Recirculation Pump Trip Function Will Resolve Concerns Noted in NRC 881206 Safety Evaluation
ML17286A269
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/27/1990
From: Eng P
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
TAC-59158, NUDOCS 9008310094
Download: ML17286A269 (3)


Text

August 27, I'99 Docket No. 50-397 Mr. G.

C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.Box 968 3000 George Washington Way

Richland, Washington 99352

Dear Mr. Sorensen:

900S3l0094 500S27 PDR ADOC>

PSPOPsyy PDC

SUBJECT:

ATWS RULE 10 CFR 50.62 RELATING TO RECIRCULATION PUMP TRIPS (RPT)

SYSTEMS (TAC No. 59158)

By our letter dated December 6, 1988, we provided our safety evaluation (SE) of your submittals regarding implementation of the Anticipated Transient Without Scram (ATWS) Rule, 10 CFR 50.62.

Our SE stated that your proposal regarding reactor recirculation pump trips (RPT) under ATWS conditions was not in compliance with the ATWS rule.

By your letter dated June 22, 1990, you responded to the concerns identified in the SE and notified us that system modifications for the ATWS-RPT had been completed during the 1990 spring refueling outage.

You also proposed an RPT pump trip logic testing scheme and indicated that technical specification changes were not required.

After several discussions with members of our staff, you agreed to modify the technical specifications to state that two operable channels per trip system were required for each ATWS-RPT trip function.

By your letter dated August 20, 1990, you committed to submit the technical specification change request to the staff for review by September 28, 1990.

We believe that this technical specification change will resolve the concerns identified in the SE.

We will review your technical specification change request upon receipt.

This completes our actions for TAC No. 59158.

S incere ly, NgftlgiSigned BY:

Patricia L. Eng, Project Manager Project Directorate -

V Division of Reactor Projects - III IV and V

DISTRIBUTION:

PD5-Reading BBoger DFoster OGC RZimmerman, RV DRSP/LA/PD DFOSTER g/+90 Document Name:

NRC 8 Local PDRs DCrutchfield PEng EJordan ACRS (10)

SNewbe ry DR

/PD5 PP /90 WNP-2 59158 CLOSURE B

CB 4QERRY

$ /j~/90 gP'/: PD5 JL 918fl P/N/90

Q 5

R I4 II 1

,f II

'1

C D

t

Mr. G. C. Sorensen WPPSS Nuclear Project No.

2 (WNP-2)

CC:

Mr. J.

W. Baker WNP-2 Plant Manager Washington Public Power Supply System P.O.

Box 968, MD 927M

Richland, Washington 99352 Mr. G.

E. Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 Mr. Alan G. Mosler, Licensing Manager Washington Public Power Supply System P. 0.

Box 968, MD 956B

Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.

Box 968, MD 1023 Richland, Washington 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, MD 280 Richland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners

Prosser, Washington 99350 Mr. Christian-Bosted U. S. Nuclear Regulatory Commission P. 0.

Box 69

Richland, Washington 99352 Nicholas S. Reynolds, Esq.
Bishop, Cook, Purcell 5 Reynolds 1400 L Street NW Washington, D.C.

20005-3502