ML17286A268

From kanterella
Jump to navigation Jump to search
Confirms Mgt Meeting on 900830 in Region V Ofc to Discuss Util Actions in Response to 1988-89 Salp,Progress on Procurement of New Facility Simulator & Other Issues of Interest.Proposed Agenda & NRC Internal Meeting Notice Encl
ML17286A268
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/23/1990
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Oxsen A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9008310005
Download: ML17286A268 (8)


Text

ggS IIECyc 0

~E c

I I

)

0 IIII0 Cy

/4, 0

+**<<+

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 AUG 2 3 1990 Docket No. 50-397 Washington Public Power Supply System P. 0.

Box 968 Richland, Washington 99352 Attention:

Mr. A. L. Oxsen Deputy Managing Director Gentlemen:

Subject:

Management Meeting This will confirm the telephone discussion on August 20, 1990 between Mr. P. Johnson of this office and Mr. G. Sorensen of the Supply System staff concerning a management meeting to be held between NRC and Supply System management representatives at the Region V Office in Walnut Creek, California, at 8:30 a.m.

on August 30, 1990.

The purpose of this meeting is to discuss actions your staff has taken in response to the 1988-89 Systematic Assessment of Licensee Performance, progress on your procurement of a new facility simulator, and other issues of interest.

A copy of the proposed agenda for this meeting is enclosed.

Also enclosed is a copy of our internal meeting notice which lists the anticipated attendees at this meeting.

Sincerely, gP R.

P.

Zimmerman, Director Division of Reactor Safety

'nd Projects

Enclosure:

Copy of Agenda Copy of NRC Meeting Notice cc:

See next page 0.": 3i'3

~ (3V83$ 0OI.>$ yaI Ig2>

PDR I-"IDGCI, 0 iI'ILI(>3@7 M

PDC gpss

~-

r

~L CC:

Mr. M. H. Philips, Esq.

Bishop, Cook, Purcell 5 Reynolds 1200 Seventeenth
Street, N.W.

Washington, DC 20036 Mr. G.

E.

Doupe, Esq.

Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 99504 Dr.

G.

D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, MD280 Richland, Washington 99352 Mr. J.

W. Baker WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box 968, MD 927M

Richland, Washington 99352

Enclosure 1

MANAGEMENT MEETING WASHINGTON PUBLIC POWER SUPPLY SYSTEM August 30, 1990 AGENDA l.

Opening

Remarks, Purpose of Conference J.

B. Martin, Regional Administrator,'nd D.

W. Mazur, Supply System Managing Director 2.

Overview of Supply System Performance -- A. L. Oxsen, Supply System Deputy Managing Director Review of Supply System actions in response to 1988-89 Systematic Assess-ment of Licensee Performance (SALP)

Plant Operations, Radiological Controls, and Maintenance/Surveillance

-- J.

W. Baker, WNP-2 Plant Manager Emergency Preparedness and Security -- M. M. Monopoli, Manager, Support Services Engineering/Technical Support (including status of simulator upgrade program) C.

M. Powers, Director of Engineering Safety Assessment/guality Verification -- G.

D. Bouchey, Director, Licensing and Assurance Conclusions -- A. L. Oxsen, Supply System Deputy Managing Director 3.

Other topics of interest 4.

Closing, remarks

~gg AK 0

Cy

~p 1~

)

Cl I

IO

'l 0

+y

~0 4 p *y 4 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 JUG 2 3 1990 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee:

Washington Public Power Supply System Name of Facility:

Washington Nuclear Project No.

2 (WNP-2)

Docket Number:

Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

Licensee Attendees:

50-397 August 30, 1990, 8:30 a.m.

Region V Office Walnut Creek, California Discuss licensee efforts since the last SALP assessment, and status of the simulator upgrade program J.

B. Martin, Regional Administrator B. A. Boger, Acting Assistant Director for Region IV and V

. Reactors, NRR R. P.

Zimmerman, Director, Division of Reactor Safety and Projects R. A. Scarano, Director, Division of Radiation Safety and Safeguards F. A. Wenslawski, Deputy Director, Division of Radiation Safety and Safeguards S. A. Richards, Chief, Reactor Projects Branch P.

H. Johnson, Chief, Reactor Projects Section 3

P. L. Eng, NRR Project Manager C. J. Bosted, Senior Resident Inspector, WNP-2 J. 0. Bradfute,'RR Project Engineer D.

W. Mazur, Managing Director A. L. Oxsen, Deputy Managing Director G.

D. Bouchey, Director, Licensing and Assurance J.

W. Baker, WNP-2 Plant Manager C.

M. Powers, Director of Engineering

,J.

P. Burn, Director of Projects G.

C. Sorensen, Manager of Regulatory Programs M. M. Monopoli, Manager, Support Services J.

R. Lewis, Program Director, Bonneville Power Administration NOTE:

Attendance at this meeting by NRC personnel other than those listed above should be made known by August 24, 1990 via telephone call to P. Johnson, FTS 463-3745 or S. Friedenthal, FTS 463-,3840.

't

bcc (w/encl osure):

PDR Ig V

PJoh on 8/go/90 SRichards RZimmerman 8/gi /90 8/N/90 EST C

PY ST C

PY VEST C

PY YES /

NO YES /

NO E

/

NO S

PDR YES /

NO

II