Forwards Insp Rept 50-397/90-09 on 900129-0208 & 0227-0309 & Forwards Notice of Violation
ML17285B257
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/26/1990
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17285B258 List:
References
NUDOCS 9005100188
Download: ML17285B257 (2)


See also: IR 05000397/1990009

Text

Docket No. 50-397

Washington Public

Power Supply System

Attention:

Mr. C. Sorensen,

Manager

Regulatory

Programs

P. 0.

Box 968

3000 George

Washington

Way

Richland, Washington

99352

Gentlemen:

Subject:

flRC Inspection at Washington

Nuclear Project,

No.

2

(WNP-2)

This refers to

a special,

announced

inspection,

conducted

by Mr. T. Meadows,

of this office, at the

WNP-2 site during the periods of January

29 - February 8,

1990,

and February

27 - March 9,

1990.

Issuance of this report has

been

postponed

pending completion of your requalification program evaluation sent

to you by letter dated April 25,

1990.

This report also refers to the discussion

of findings by the inspectors

with members of your staff during this inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of operating

procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that several

of your

activities were not conducted

in full compliance with NRC requirements,

as

set forth in the Notice of Violation, enclosed

herewith

as Appendix A.

Your response

to the enclosed

Notice is to be submitted in accordance

with

the provisions of 10 CFR 2.201

as stated

in Appendix A, Notice of Violation.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

The response

directed

by this letter and the accompanying

Notice are not

subject to the clearance

procedure of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

Denni s

F. Kirsch, Chief

Reactor

Safety Branch

9005iOOi88

5'00426

PDR

ADOCK 05000897

9

PDC

Enclosures:

l.

Appendix

A - Notice of Violation

2.

Inspection

Report

Number 50-397/90-09

cc w/enclosures:

Mr. C.

M. Powers,

WNP-2 Plant Manager

Mr. A. G. Hosier,

WNP-2 Licensing Manager

Mr. G.

D. Bouchey, Director, Assurance

5 Licensing

Mr. G.

E. Doupe,

Esq.,

WPPSS

Mr. A. Lee Oxen, Assistant

Managing Director for Operations

State of WA (Curtis Eschels)

Mr. M. H. Phillips, Attorney

Bishop,

Cook, Purcell

5 Reynolds

bcc w/enclosures:

Project Inspector

Resident

Inspector

docket file

G.

Cook

A. Johnson

B. Faulkenberry

J. Martin

bcc w/o enclosure

2:

M. Smith

J. Zollicoffer

S

C

Y

/

NO

EUS

CP

ES /

NO

U

T

C

P

EOUES

S /

NO

YES /

0

T.MEADOWS ~~

L.MILLE

4/zc/90

4/+0

P.JOHHSOH~

O.KIRSCH~

4/~90

4/~90