May 2, 1990 Docket No. 50-397 Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
DISTRIBUTION NRC-Im Local PDRs PD5 Reading JZwolinski LA RSamwor th GPA/PA OGC
'Hagan EJordan GHi1 1 (4)
Wanda Jones JCalvo ACRS (10)
ARM/LFMB Region V (4)
SNewberry BMarcus
SUBJECT:
SATISFACTION OF LICENSE CONDITION 2.c. (16),
ATTACHMENT 2, ITEM 3. (b)
FLUX MONITORING (TAC NO. 73415))
The operating license for WNP-2 includes condition 2.c.(16), Attachment 2, Item 3.(b), which requires that you "...shall implement (installation or up-grade) requirements of Regulatory Guide 1.97, Revision 2, for flux monitoring prior to startup following the fourth refueling outage."
By letter dated June 15, 1989 (G02-89-109) you advised that the license condition had been met.
The staff reviewed the correspondence which you provided documenting your efforts to meet that license condition.
Based on the staff's review it has been concluded that the neutron flux monitoring system which you installed meets the Category 1 criteria of Regulatory Guide 1.97 and 10 CFR 50.49, and therefore satisfies the license condition.
For your information, I have enclosed a safety evaluation summarizing the staff review.
We are reviewing your application to add the flux monitor to the table of accident monitoring instrumentation in the technical specifications as a
separate action.
S incere ly, original signed by Robert Samworth Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc: w/enclosures See next page D
S RSP/PD5 (A
/D: PDS on RSamworth:dr ns 5/3 /90 5/ //90 5
90 t WNP2 FLUX MONITOR 73415]
900509027i 900502 PDR ADOCK OVO00397 P
'DC p(
I o
i
"1 gp,R (4
Op RfgI 0
C0O
~I ~
gO
- 4 t
t UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 May 2, 1990 Docket No. 50-397 Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way
- Richland, Washington 99352
Dear Mr. Sorensen:
SUBJECT:
SATISFACTION OF LICENSE CONDITION 2.c. (16),
ATTACHMENT 2, ITEM 3. (b)
FLUX MONITORING (TAC NO. 73415))
The operating license for WNP-2 includes condition 2.c.(16),,
Item 3.(b), which requires that you "...shall implement (installation or up-grade) requirements of Regulatory Guide 1.97, Revision 2, for flux monitoring prior to startup following the fourth refueling outage."
By letter dated June 15, 1989 (G02-89-109) you advised that the license condition had been met.
The staff reviewed the correspondence which you provided documenting your efforts to meet that license condition.
Based on the staff's review it has been concluded that the neutron flux monitoring system which you installed meets the Category I criteria of Regulatory Guide 1.97 and 10 CFR 50.49, and therefore satisfies the license condition.
For your information, I have enclosed a safety evaluation summarizing the staff review.
We are reviewing your application to add the flux monitor to the table of accident monitoring instrumentation in the technical specifications as a
separate action.
S incere ly, Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IY, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc: w/enclosure See next page
~ y
~
~
Hr. G.
C. Sorensen WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Mr. C.
M. Powers WNP-2 Plant Manager Washington Public Power Supply System P.O.
Box 968, MD 927M Richland, Washington 99352 Mr. G.
E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P. 0.
Box 968, MD 956B Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.
Box 968, MD 1023 Richland, Washington 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD 280 Richland, Washington 99352 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners
- Prosser, Washington 99350 Mr. Christian Bosted U. S. Nuclear Regulatory Commission P. 0.
Box 69 Richland, Washington 99352 Nicholas S. Reynolds, Esq.
- Bishop, Cook, Purcell 5 Reynolds 1400 L Street NW Washington, D.C.
20005-3502