REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY/RELIEF VALVES LIMITING CONDITION FOR OPERATION ACTION: (Continued)

C.

valve(s) within 2 minutes or if suppression pool average water tempera-ture is 110 F or greater, place the reactor mode switch in the Shut" down position.

With one or more safety/relief valve acoustic monitors inoperable, restore the inoperable monitor(s) to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />."""

SURVEILLANCE RE UIREMENTS 4.4.2 The acoustic monitor for each safety/relief valve shall be demonstrated OPERABLE by performance of a:

a.

CHANNEL CHECK at least once per 31 days, and a

b.

CHANNEL CALIBRATION at least once per 18 months.""

90042300hf 9004i3 PDR ADOCK 05000397 P

PNU

""The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test.

"**The acoustic monitors may be inoperable until the fifth Refueling Outage scheduled for No Later Than May 15, 1990 without applying the shutdown requirement.

WASHINGTON NUCLEAR - UNIT 2 3/4 4-7a Amendment No.

80

REACTOR COOLANT SYSTEM 3/4.4.3 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.3.1 The following reactor coolant system leakage detection systems shall be OPERABLE:

a.

The primary containment atmosphere gaseous radioactivity monitoring

system, b.

The primary containment sump flow monitoring system, end c.

The primary containment atmosphere'articulate radioactivity monitoring system.

APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

With only two of the above required leakage detection systems. OPERABLE, operation may continue for up to 30 days provided grab samples of the con-tainment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the required gaseous and/or particulate radioactive monitoring system is inoperable; otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE RE UIREMENTS 4.4.3.1 The reactor coolant system leakage detection systems shall be demonstrated OPERABLE by:

a.

Primary containment atmosphere particulate and gaseous monitoring systems-performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a

CHANNEL FUNCTIONAL TEST at least once per 31 days and a CHANNEL CALIBRATION at least once per 18 months.

b.

Primary containment sump flow monitoring system-performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days and a CHANNEL CALIBRATION TEST at least once per 18 months.

f WASHINGTON NUCLEAR - UNIT 2 3/4 4-8

M<- G. C...Sorensen WPPSS Nuclear Project No.

2 (WNP-2)

CC:

Mr. C.

M. Powers WNP-2 Plant Manager Washington Public Power Supply System P.O.

Box 968, MD 927M

Richland, Washington 99352 Mr. G.

E. Doupe, Esquire Washington Public Power Supply System P.

0.

Box 968 3000 George Washington Way

Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P.

0.

Box 968, MD 956B Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P.

0.

Box 968, MD 1023

Richland, Washington 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System'.

0.

Box 968, MD 280

Richland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners

Prosser, Washington 99350 Mr. Christian Bosted U. S. Nuc'lear Regulatory Commission P. 0.

Box 69

Richland, Washington 99352 Nicholas S.
Reynolds, Esq.
Bishop, Cook, Purcell

& Reynolds 1400 L Street NW Washington, D.C.

20005-3502