ML17285A959

From kanterella
Jump to navigation Jump to search
Forwards Directors Decision,Transmittal Ltr & Fr Notice in Response to a Harlowe & Ecology Ctr of Southern California 2.206 Petition Requesting That NRC Fix or Close All Nuclear Power Reactors Designed by Ge.Request Has Been Denied
ML17285A959
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/12/1990
From: Trammell C
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
2.206, NUDOCS 9001190111
Download: ML17285A959 (6)


Text

e

C'e Docket ti'.60-397 f

I Mr. G.

C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99352

Dear Mr. Sorensen:

The petitioner requested that the NRC fix or close all nuclear power reactors designed by General Electric Company.

As discussed in the enclosed Director's Decision, the Petitioner's request under 10 CFR 2.206 has been denied.

The petitioner also expressed concern that GE is pursuing a "standardized" Advanced Boiling Water Reactor design which petitioner alleges fails to address many of the shortcomings identified by GE's own engineers as far back as the 1975 Reed Report.

The petitioner was informed that the staff has not yet completed its safety evaluation for advanced boiling water reactor designs, nor has any utility applied for a license to build or operate an advanced boiling water reactor.

Sincerely, original signed by Charles M. Trammell Charles M. Trammell, Acting Director Project Directorate V

Division of Reactor Projects - III IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosures:

1.

Letter dated December 4, 1989 to Ms.

Anna Harlowe 2.

Director's Decision dated December 4,

1989 3.

Federal Re ister Notice

~ate Decem er 4, 1989 cc w/enclosures:

See next page DOCUMENT NAME:

2.206 TRANSMITTAL e

~

~NRC IE Local PDRs

  • PDV Reading

.CTrammell JZwolinski

~JLee

TColburn W/encl.

Enclosed for your information are copies of a Director s Decision, letter of transmittal, and Federal Re ister notice issued by the Director, Office of Nuclear Reactor Regu a ion erector) in response to a Petition filed under 10 CFR 2.206 of the Commission's regulations.

The Petition was filed by Ms. Anna Harlowe on behalf of the Ecology Center of Southern California.

FC

D SP D

NAME :J DATE:1//Q/90 PD A

D RSP PD amworth:

mme 1 1 wo woo+ e

.:U(ll90:sllII9o OFFICIAL RECORD COPY 900ii90iii 900112 PDR ADOCK 05000397 PDC p~l )~D L((

r

'h I~

a

r 9.S 148aI 4

~C'>>

O~

Ce 4

caO C

ae

/+

9,

+a9*W+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 12, 1990 Docket No. 50-397 Hr.

G.

C. Sorensen, Hanager Regulatory Programs Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99352

Dear Hr. Sorensen:

Enclosed for your information are copies of a Director's Decision, letter of transmittal, and Federal Re ister notice issued by the Director, Office of Nuclear Reactor Regu ation irector) in response to a Petition filed under 10 CFR 2.206 of the Commission s regulations.

The Petition was filed by Hs.

Anna Harlowe on behalf of the Ecology Center of Southern California.

The petitioner requested that the NRC fix or close all nuclear power reactors designed by General Electric Company.

As discussed in the enclosed Director's Decision, the Petitioner's request under 10 CFR 2.206 has been denied.

The petitioner also expressed concern that GE is pursuing a "standardized" Advanced Boiling Water Reactor design which petitioner alleges fails to address many of the shortcomings identified by GE's own engineers as far back as the 1975 Reed Report.

The petitioner was informed that the staff has not yet completed its safety evaluation for advanced boiling water reactor designs, nor has any utility applied for a license to build or operate an advanced boi ling water reactor.

Sincerely,

Enclosures:

1.

Letter dated December 4, 1989 to Hs.

Anna Harlowe 2.

Director's Decision dated December 4, 1989 3.

Federal Re ister Notice

~ate ecem er 4, 1989 MM i+~-E4 Charles H. Trammell, Acting Director Project Directorate V

Division of Reactor Projects -III IY, V and Special Projects Office of Nuclear Reactor Regulation cc w/enclosures:

See next page

C C

J Pl

Mr. G.

C. Sorensen WPPSS Nuclear Project No.

2 (WNP-2)

CC:

Hr.

C. H. Powers WNP-2 Plant Manager Washington Public Power Supply System P.O.

Box 968, MD 927M Richland, Washington 99352 Mr. G.

E. Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Hail Stop PY-11 Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Hanager Washington Public Power Supply System P. 0.

Box 968, MD 956B Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.

Box 968, MD 1023 Richland, Washington 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, MD 280

Pichland, Washington 99352 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners

Prosser, Washington 99350 Mr. Christian Bosted U. S. Nuclear Regulatory Commission P. 0.

Box 69 Richland, Washington 99352 Nicholas S. Reynolds, Esq.

Bishop, Cook, Purcell II Reynolds 1400 L Street NW Washington, D.C.

20005-3502 (10)

(