Forwards Enforcement Conference Rept 50-397/89-22 on 890628 to Discuss Potential Enforcement Issues Re Environ Qualification of Electrical Equipment & Commercial Grade Procurement & Dedication Process
ML17285A650
Person / Time
Site: Columbia 
Issue date: 07/21/1989
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17285A651 List:
References
NUDOCS 8908110324
Download: ML17285A650 (4)


See also: IR 05000397/1989022

Text

<Ccg~~gZD

DlrrRIBUTloN

DEMONSTRaT105

sYsYEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~

'CCESSION NBR:8908110324

DOC.DATE: 89/07/21

NOTARIZED:'NO

DOCKET

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public

Powe

05000397

AUTH.NAME

AUTHOR AFFILIATION

FAULKENBERRY,B.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

MAZUR,D.W.

Washington Public Power Supply System

SUBJECT:

Forwards

Enforcement

Conference

Rept 50-397/89-22

on 890628

to discuss potential enforcement

issues.

DISTRIBUTION CODE:

IE45D

COPIES

RECEIVED:LTR

I ENCL I

SIZE:

3 +

TITLE: Summary of Significant Meeting with Licensee

(Part

50)

NOTES:

RECIPIENT

ID CODE/NAME

PDS

LA

INTERNAL: AEOD/DOA

DEDRO

NRR/DREP/EPB

10

NUDOCS-ABSTRACT

LE

RGN5

FILE

01

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

0

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

SAMWORTHgR

AEOD/DSP/TPAB

NRR/DLPQ/PEB

10

NRR/PMAS/ILRB12

OGC/ROED

RES/DSIR/EIB

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

R

I

S

A

NCTE IO ALL 'RICS" RZCIPIBGS:

PLEASE HELP US M REDUCE HASTE!

CXNZKCT 'IHE DOCXMWZ CONTROL DESKI

RXM Pl-37

(EXT. 20079)

TO ELXKBQXB 'YOUR SAME PKH DIPHGBUTICN

LISTS KK DOCUMEMXS KRJ DOHiT NEEDt

D

S

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

16

ENCL

15

vi

1

13IIS

Docket

No. 50-397

Washington Public Power Supply System

P. 0.

Box 968

3000 George

Washington

Way

Richland, Washington

99352

Attention:

Mr. D.

W. Mazur

Managing Director

SUBJECT:

ENFORCEMENT CONFERENCE/MANAGEMENT MEETING

Gentlemen:

This refers to the enforcement

conference

and management

meeting held with

Mr. A. L. Oxsen,

Dr.

G.

D. Bouchey,

Mr. J.

P. Burn, and other

members of the

Supply System staff in the Region

V office on June 28,

1989.

The subjects

discussed

are

summarized

in the enclosed

report.

The purpose of the conference

was to discuss

potential

enforcement

issues

related to environmental qualification of electrical

equipment

and your

commercial

grade

procurement

and dedication

process.

After completion of the

enforcement

conference,

we also discussed

the high number of shutdown cooling

isolations that occurred during the

1989 refueling outage,

as well as other

issues of current interest.

Enforcement action involving the environmental qualification issues

discussed

during the enforcement

conference

is being reviewed

and will be addressed

in

separate

correspondence.

With regard to the commercial

grade

procurement

and dedication

process,

we

require

more information on the acceptability of the

10 items in question

before

we can conclude

whether

a hardware deficiency exists.

During the

conference

we agreed with your plan to reevaluate

the suitability of these

items for safety related

use,

which was expected

to take 30-45 days to com-

plete.

However,

due to the potential safety significance of the five items

already installed in the plant, reevaluation of these

items

was requested

on

an expedited basis.

Your reevaluation of the installed items

was provided to

us in your letter dated July 10,

1989 which we reviewed

and concluded that

additional

information was

needed

to complete

our evaluation.

Therefore,

we

requested

in our letter dated July 14,

1989, that you resubmit your response

to our original request with emphasis

on identification and verification of

the applicable critical characteristics.

Based

upon our discussions

at the

conclusion of the enforcement

conference,

we understand

your reevaluation for

the remaining

items will be submitted in writing by August 15,

1989 along

with any available

followup information on the five installed items.

PDR

g

~ ~+0722

ssoes

1 oap

QCg 050gggp~

Pvu

-2-

As also discussed

in the enclosed

report,

we are concerned

about the

number

of shutdown cooling isolations

experienced

at the

WNP-2 facility during the

1989 refueling outage.

While we recognize that these

individual events

were

of minimal safety significance,

they clearly indicate

a

need for improved

control of plant activities and/or

improved reliability of safety features

actuation

systems.

We encourage

you to give careful

management

attention to

these

events

and their underlying root causes.

In accordance

with 10 CFR 2.790(a),

a copy of this letter

and the enclosure

will be placed in the

NRC Public Document

Room.

Your continued cooperation

is appreciated.

If you have

any questions

concerning this report,

we will be pleased

to discuss

them with you.

Sincerely,

'4

'~ A~ c'pw.~

B. H.

Fq6 'nberry<

Deputy R'egional Administrator

Enclosure:

NRC Meeting Report

No. 50-397/89-22

cc w/enclosure:

A. L. Oxsen, Assistant

Managing Director for Operations

G.

D. Bouchey, Director, Assurance

8 Licensing

J.

P. Burn, Director of Engineering

C.

M. Powers,

WNP-2 Plant Manager

A. G. Hosier,

WNP-2 Licensing Manager

G. E. Doupe,

Esq.

N. S. Reynolds,

Debevois,

Cook, Purcell

8 Reynolds

State of Washington

bcc w/copy of enclosure:

Docket File

Project Inspector.

Resident

Inspector

G.

Cook

B. Faulkenberry

J. Martin

A. Johnson

J. Lieberman,

OE

R. Nease,

NRR

bcc w/o enclosure:

M. Smith

LFMB

p.fV

REGION

V C

WWagner/dot

7/Wt/89

7/z,l/89

PPK

DKirsch

7/8 ~/89

A

ee

7/~'/

1

AJohnson

7/kl/89

REQUEST

C

PY

REQUEST

C

PY

REQUEST

C

PY

YES /

NO

YES

NO

YES

/

NO

RZimmerman

BFa

1 enberry

7/o i/89 Rl'~

7/89

R

VEST

COPY

REQUEST

0

Y

,YES /

NO

YES /

N

ND T

PDR

YES

Y /

NO

REOU ST

C

PY

R

)ST

C

PY

YES /

NO

~YES'

NO

1