Text
gC CPM RATED D1S7KBUT1 ON DE M04 STRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8908010426 DOC.DATE: 89/07/27 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION ZXMMERMAN,R.P.
Region 5, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION MAZUR,D.W.
Washington Public Power Supply System DOCKET g
05000397
SUBJECT:
Confirms mgt meeting on 890808 at site to discuss results of SALP for period ending 890531.
DISTRIBUTION CODE:
IE40D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Systematic Assessment of Licensee Performance (SALP) Report NOTES:
RECXPIENT ID CODE/NAME PD5 LA SAMWORTH,R XNTERNAL: ACRS AEOD/DSP/TPAB DEDRO NRR/DLPQ/HFC 10 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NRR/DRIS/SGB 9D NRR/PMAS/ILRB12 EXTERNAL: L ST LOBBY WARD NRC PDR COPIES LTTR ENCL 1
0 1
1 2
2 1
1 1
1 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 RECIPXENT ID CODE/NAME PD5 PD AEOD/DOA COMMISSION NRR SHANKMAN,S NRR/DLPQ/PEB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NRR/DRIS/SIB 9A NUDOCS-ABSTRACT OGC/HDS2 RGN5 FILE 01 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 5
5 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 NOIE 'IO ALL "RIDS" RECIPXENIS:
PIZASE HELP US 10 REDUCE HASTE CGHIACr IHE DOCUMEÃP COÃIROL DESKS RQCN.Pl-37 (EXT. 20079)
KO ELIMINATEKKR NME HKH DIPIVHBVI!ICÃ LIEN HDR DOCUMEHIS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED:
LTTR 33 ENCL 32
Docket No. 50-397 Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352 Attention:
Mr. D.
W. Mazur Managing Director Gentlemen:
Subject:
SALP Management Meeting This will confirm the telephone discussions of July 18 and 20, 1989 between Mr. P. Johnson of this office and Mr. L. Oxsen of the Supply System staff concerning a management meeting to be held between NRC and Supply System representatives at the WNP-2 Site near Richland, Washington, at 8:00 a.m.
on August 8, 1989.
The purpose of this meeting is to discuss the results of the Systematic Assessment of Licensee Performance (SALP) for your WNP-2 facility for the 12-month period ending on May 31, 1989.
The SALP Board's initial report was transmitted to you by Mr. J.
B. Martin's letter dated July 24, 1989.
Enclosed is a copy of our internal meeting notice which lists the anticipated attendees at this meeting.
Sincerely, R.
P.
Zimmerman, Acting Director Divisi'on of Reactor Safety and Projects
Enclosure:
Copy of NRC Meeting Notice cc:
See next page
CC:
Mr. Nicholas S. Reynolds, Esq.
- Bishop, Cook, Purcell 8 Reynolds 1200 Seventeenth
- Street, N.W.
Washington, DC 20036 Mr. G.
E.
- Doupe, Esq.
Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 99504 Dr.
G.
D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD280
- Richland, Washington 99352 Mr. C.
M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box 968, MD 927M Richland, Washington 99352 bcc w/enclosure:
Project Inspector Resident Inspector docket file G.
Cook B. Faulkenberry J. Martin R. Nease, NRR J. Zollicoffer M. Smith State of WA bcc (w/enclosure):
PDR '~
REGION Y
PJohnson
'Chaffee RZi erman 7/~1/89 7/gf/89 7/[/89 EQUKST COPY J
QUEST COPY Q EST COPY YES i/
NO YES /
NO YES /
NO
~o.,
'YES// 'O
NOTICE OF SIGNIFICANT LICENSEE MEETING Name of licensee:
Washington Public Power Supply System Name of Facility:
Washington Nuclear Project No.
2 (WNP-2)
Docket Number:
Date and Time of Meeting:
Location of Meeting:
Purpose of Meeting:
NRC Attendees:
Licensee Attendees:
50-397 August 8, 1989, 8:00 a.m.
WNP-2 Site Near Richland, Washington Discuss results of Systematic Assessment of Licensee Performance (SALP) for the period ending May 31, 1989 J.
B. Martin, Regional Aaministrator R.
P.
Zimmerman, Acting Director, Division of Reactor Safety and Projects G.
W. Knighton, Director, Project Directorate V,
NRR P.
H. Johnson, Chief, Reactor Projects Section 3
R. B. Samworth, NRR Project Manager C. J. Bosted, Senior Resident Inspector, WNP-2 D.
W. Mazur, Managing Director J.
W. Shannon, Deputy Managing Director A. L. Oxsen, Assistant Managing Director - Operations G.
D. Bouchey, Director, Licensing and Assurance J.
P. Burn, Director of Engineering L. L. Grumme,
- Manager, Nuclear Safety Assurance L. J.'arvin,
- Manager, Programs and Audits C.
H. McGilton, Manager, Operational Assurance Programs C.
M. Powers, WNP-2 Plant Manager L. T. Harrold, Manager, Generation Engineering J.
W. Baker, Assistant WNP-2 Plant Manager NOTE:
Attendance at this meeting by NRC personnel other than those listed above should be made known by August 4, 1989 via telephone call to M. Mendonca, FTS 463-3720.