ML17284A720

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/98-13 on 980607-0718 & Notice of Violation.Insp Period Was Highlighted by Plant Restart from WNP-2 13th Refueling Outage,Subsequent Plant Shutdown to Repair Traversing Incore Probe Sys & 980617 Flooding Event
ML17284A720
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/07/1998
From: Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17284A721 List:
References
50-397-98-13, EA-98-398, NUDOCS 9808140247
Download: ML17284A720 (6)


See also: IR 05000397/1998013

Text

t"CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RID

ACCESSION NBR:9808140247

DOC.DATE: 98/08/07

NOTARIZED: N

~

~

'. FACIL:50-397 WPPSS Nuclear Project,

Unit 2, Washington

Pub

c Powe

AUTH.NAME

AUTHOR AFFILIATION

WONG, H. J.

~

Region

4

(Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

DOCKET ¹

05000397

SUBJECT:

Forwards insp rept 50-397/98-13

on 980607-0718

8 notice of

violation.Insp period was highlighted by plant restart

from

WNP-2 13th refueling outage, subsequent

plant shutdown to

repair traversing incore probe

sys

& 980617 flooding event.

DISTRIBUTION CODE'EOIF

COPIES

RECEIVED'LTRl ENCL i

SIZE'

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

E

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEO

ILE .CENTER

CB

NUDOCS -ABSTRACT

OGC/HDS3

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

POSLUSNY,C

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

TERNAL

LITCO BRYCE F J

H

'RC

PDR

1

1

1

1

NOAC

NUDOCS FULLTEXT

1

1

1

1

D

~)g Oat.,UR'lE4~

HAS BE+" '""'

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTZON LISTS

OR REDUCE THF NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

tDCD)

ON EXTENSION C15-2083

f

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

19

ENCL

19

~istic ttECtr(

~o

o

.; ~l

/d

v

Q

+**+"

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

AUG 6 (

Qgg

EA 98-398

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

SUBJECT: NRC INSPECTION REPORT 50-397/98-13 AND NOTICE OF VIOLATION

Dear Mr. Parrish:

From June 7 through July 18, 1998, an inspection was conducted at your Washington Nuclear

Project-2 (WNP-2) reactor facility. The enclosed report presents the scope and results of that

inspection.

The inspection period was highlighted by plant restart from WNP-2's 13th refueling outage, a

subsequent

plant shutdown to repair the traversing incore probe system, and the June 17 fire

main flooding event.

In general, your staff responded well to each of these challenges with the

proper focus on operational safety and appropriate identification and resolution of the

underlying issues.

ALARAplanning and execution of repairs to the traversing incore probe

system was noteworthy.

However, in the course of our review of these events, two violations of

NRC requirements were identified. The first violation is related to the mispositioning of a low

pressure core spray system valve. We note that subsequent to the valve being mispositioned

numerous control room board walkdowns failed to identify the discrepancy.

The second

violation is related to the failure to install a cap on the equipment drain line from residual heat

removal pump Room B. This cap was a barrier against common mode flooding in the reactor

building, as described in the WNP-2 Final Safety Analysis Report.

-

These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding these violations are described in detail in the enclosed report. The NRC has

concluded that information regarding the reasons for the violations, and the corrective actions

taken and planned to correct the violations to prevent recurrence, is already adequately

addressed

on the docket in the enclosed report. Therefore, you are not required to respond to

this letter unless the description therein does not accurately reflect your corrective actions or

your position.

In that case, or ifyou choose to respond, you should followthe instructions

specified in the enclosed Notice.

9808140247

980807

PDR

ADOCK 05000397

G

PDR

)~d/

Washington Public Power Supply System

-2-

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sincerely,

Docket No.:

50-397

License No.:

NPF-21

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-397/98-13

cc w/enclosures:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-3172

Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

H. J. Wo g, Chief

Reactor Projects Branch E

Division of Reactor Projects

0

Washington Public Power Supply System

-3-

Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel

. Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Perry D. Robinson, Esq.

Winston 8 Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File

OE Files

Resident Inspector

DRS-PSB

MIS System

RIV File

J. Lieberman, OE

G. Sanborn

DOCUMENT NAME: R:i WN2iWN813RP.SAB

To receive cop

of document, Indicate In box: "C" = Copy without enclosures

"E" = Copy with

nclosures "N"= No cop

RIV:SRI:DRP/E

AI

SABoynton

08/ /98

~ p.mc

~

Rl

BASmallridge~<

AD WCFO 8

PM NRR

DFKirsch M>, CPoslusny e~

WM98->/si/~7

08/ /98

P'i @hi)g

Rl

g

C:DRP/E

JESpets~

HJWong

rP'3

Rl

SCBu

n

08

98

h

Rl

C

JJRussell

~W ri'r.graf

Ar

C~~ MWfc

8/io /98

8/ /98

~

7'

Oui OFFICIALRECORD COPY

/ + ~'yHf m