Monthly Operating Rept for June 1988 for WNP-2
ML17284A426
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8807130415
Download: ML17284A426 (10)


Text

>,~o ACCELERATED DIS'rRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 07 Oy ACCESSION NBR.8807130415 DOC DATE. 88/06/30u NOTARIZED.

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET N

05000397

SUBJECT:

Monthly operating rept for June 1988 for WNP-2.W/880708 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR J ENCL i

SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES R,

/D RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 1 1 B 10 R

G FIL 01 EXTERNAL: EGGG WILLIAMS,S NRC PDR COPIES LTTR ENCL 1

0 1

0 10 10 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 5

5 1

1 2

2 1

1 1

1 1

1 1

1 1

1 D

8 R;

I' SOTAL NUMBER OF COPIES REQUIRED:

LTTR 31 ENCL 29

OPERATING DATA REPORT WNP-2 01-Jul-88 1.

DOCKET: 50-397 2.

REPORTINB PERIOD:

3.

UTILITY CONTACT a Jun-88 OUTAGE + QN-LINE HOURS LEONARD HUTCHISON (509) 377-2486 720 4.

LICENSED THERNAL POWER (MWt):

5 NANEPLATE RATING (GROSS NWe):

6.

DESIGN ELECTRICAL RATING (NET MWe):

7.

MAXINUN DEPENDABLE CAPACITY (GROSS NWe):

8.

MAXIMUN DEPENDABLE CAPACITY (NET NWe):

3323 1200 '

1100 1140 1095 9.

IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

10.

POWER TO WHICH RESTRICTED, IF ANY (NET NWe):

11.

REASONS FOR RESTRICTIONS~

IF ANY:

12.

REPORT PERIOD HOURS 13.

HOURS REACTOR CRITICAL 14.

RX RESERVE SHTDWN HRS 15.

HRS GENERATOR ON LINE lb. UNIT RESERVE SHUTDOWN HOURS 17.

GROSS THERNAL ENERGY (MWH) 18.

GROSS ELECTRICAL ENERGY (NWH) 19.

NET ELECTRICAL ENERGY (NWH) 20.

UNIT SERVICE FACTOR 21.

UNIT AVAILABILITYFACTOR 22.

UNIT CAPACITY FACTOR (MDC NET) 23.

UNIT CAPACITY FACTOR (DER NET) 24.

UNIT FORCED OUTAGE RATE 25.

FORCED OUTAGE HOURS NONTH 720 200.,5'.0 90.7 0.0 156036 47840 45507 12 F 6/

12.6/

5'/

5.7/

0.0/

0.0 YEAR CUNULATIVE 4367 31087.2 i'423:-.7 22330. 5

'.0 340.4 2266.8 21408.7 0.0 381.7 6875734 57258501 2292160 19109300 2211859 18379811 51.9/

68'/

51.9'/

70.1/

46.3/

54.0/

46.0/

53.7/

23.8/

9.9/

709.3 2354.3 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 NONTHS (TYPEpDATEpDURATION)-

27. IF CURRENTLY SHUTDOWN ESTINATED STARTUP DATE:

8807130415 880630 PDR ADOCK 05000397 R

PDC

0 II 4 ~

tr

BEPCAT. PERIOD ~~ 19~

mcnth, year LNIT SllUTDOHNS / REDUCTIONS DOCKET NO.

50-397 UNIT NAME WNP-2 DATE July 5, 1988 COMPLETED BY TELEPf lONE (509)377-2486 1T(5.

0~K TTPF 16m REAsGH MM~Mlco iX%1K E

Y Xl COMf".O E C

S

& CORRLC I C IO T

PBFVE R

C RRENC 88"07 4/30/88 S

550.5 C

88-08 6/24/88 S

1.7 B

88-09 6/24/88 S

77.2

~

B RC FUELXX REFUELING OUTAGE CONCLUDED HA MECFUN RB-'CRDRVE"..

'ENERATOR WAS REMOYED FROM GRID TO PERFORM OVERSPEED TESTS ON TURBINE GENERATOR WAS REMOVED FROM SERYICE FOR SCRAM TESTING.

PLANT REMAINED DOWN FOR REPLACEMENT OF FAULTY MSIV ACTUATOR WNP-2 REFUELING OUTAGE CONCLUDED WITH TWO OUTAGES FOR TESTING DURING STARTUP TYPE F-Forced S-Sched A-Equip Failure O-Maint or Test

~

C-Be fue ling D-Regula tory Bes triction E-Operator Training

& License Examination F-Admin 0-Oper Error M-Other HEI MOD 1-Manual 2-manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM & COMPOhCNT Exhibit F & M Instructions for Preparation of Data-Entry Sheet Licensee Event Report (LER) File (NUREG-0161)

V

'I b

, o~~

I J

AVERAGEDAILYUNITPOWER LEVEL DOCKET NO.

UNIT WNP "2 Ava~

COMPLETED gY L8 Hutch'on TELEPHONE MONTH JUNE 1988 DAY-AVERAGEDAILYPOWER LEVEL (MWe-Net) 1 0

DAY AVERAGEDAILYPOWER LEVEL (MWe-Net) 0 17 18 19 20 0-.

24 94 10 12 13 14 15 2930'24 707 661 INSTRUCTIONS Qn this form, list the average daily unit power level in MFe-Net for each day in the reporting month. Compute to the

= nearest whole megawatt.

these figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100'fo line (or the respected power level line). In such cases,- the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

I; V

V g ~

4

si WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397 July 8; 1988 U.S.

Nuclear, Regulatory Commission Document Control Desk Washington, D.G. 20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO.

2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, June 1988 as required by our, Technical Specifications 6.9.1.6.

Very Truly Yours, C. N. Powers (N/D 927M)

WNP-2 Plant Manager, CNP/lc Enclosure cc:

Nr..

Nr,.

Ns.

Mr,.

Nr,.

J.

B. Nar,tin C. J.

Bosted Dottie Sherman J. T. Wheelock W.

H. Lovelace NRC Region V

NRC Site Representative (901A)

ANI, Farmington GT INPO NRG, Washington D.G.

ll~

~

~

4

~ c