ML17279B021

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-397/OL-88-01 on 880322-23
ML17279B021
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/21/1988
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shannon J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17279B022 List:
References
NUDOCS 8805090269
Download: ML17279B021 (3)


Text

h I

8

" AC CELERATED DISTRIBUTION DEM01RATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8805090269 DOC.DATE: 88/04/21 NOTARIZED: NO FACIL:50-397 WPPSS Nuclear Project, Unit 2,,Washington Public Powe AUTH.NAME AUTHOR AFFILIATION PATE,R.J.

Region 5, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION SHANNON,J.

Washington Public Power Supply System lz

SUBJECT:

Forwards Exam Repn 50-397/OL-88-01 on 8803)7@3:

DISTRIBUTION CODE:

IE42D COPIES RECEIVED:LTR

'"ENCL SIZE:

TITLE: Operator Licensing Examination Reports NOTES:

DOCKET I 05000397 R

RECIPIENT ID CODE/NAME PD5 PD COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1

1 SAMWORTH,R COPIES LTTR ENCL 1

1 INTERNAL: ACRS NRR MORISSEAU F D NRR DLPQ/OLB 10 G=F 02 EXTERNAL LPDR NSIC 2

2 1

1 2

2 1

1 1

1 1

1 AEOD/DSP/TPAB NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGN5 FILE 01 NRC PDR 1

1 1

1 1

1 1

1 1

1 j

A 8

A TOTAL NUMBER OF COPIES REQUIRED:

LTTR 15 ENCL 15

Docket No. 50-397 Nr. Jack Shannon Deputy Managing Director Washington Public Power Supply System 3000 George Washington Way Hail Drop 1023 Richland, Washington 99352

Dear Nr. Shannon:

Subject:

Examination Report x

On March 22-23, 1988, the HRC administered examinations to employees of your facility who had applied for a license to operate your Washington Nuclear Project, Unit 2.

At the conclusion of these examinations, the written examination questions were reviewed with your training staff.

On March 24, 1988, the examination process and associated licensing issues were discussed with members of your staff identified in the enclosed report.

In accordance with 10 CFR 2.790(a),

a copy of this letter and enclosures (1) and (2) will be placed in the NRC's Public Document Room.

The results for the individual applicant are exempt from disclosure by 10 CFR 9.5(a)(6).

Therefore, enclosure (3) will not be placed in the NRC's Public Document Room.

Should you have any questions concerning this examination, please contact Nr. Thomas Meadows at (415) 943-3867.

Sincerely, Robert J.

Pate, Chief Reactor Safety Branch

Enclosures:

- l.

Examination Report No. 50-397/OL-88-01 (w/attachments A, B, and C) 2.

Examination and Answer Keys (SRO/RO) 3.

Power Plant Examination Results Summary TE /z 8805090269 880421 PDR ADOCK 05000397 DCD

Mr. Jack Shannon April 21, 1988 cc w/enclosures

( 1), (2), and (3):

John Wyrick, Manager-Nuclear License Training, WNP-2 cc w/enclosure (1) only:

J. Martin, RV D. Kirsch, RV J.

El in, RV T. Meadows, RV C. Bosted, RV, SRI J.

Hannon, Branch Chief, OLB R. Samworth, PO-V T. Guilfoil, SONALYST'c w/enclosure (3) only:

Janet

Lanning, OLB cc w/enclosures (1) and (2) only:

RSB/Document Control Desk (RIDS)

RV/3 k 0

TO

/

O REQU ST C

PY REQUEST C

PY RE UES C

Y j YES /

NO YES /

NO YES /

NO

] ~ ~~dl&F rrAgCJCW~

  • DO NOT SEND ENCLOSURE 3

TO PDR MEADOWS >~

4/rs /88 ELI 4//P/88 PATE 4/)$ 88