ML17279A981

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Consisting of Administrative Corrections Re Cycle 4 Reload
ML17279A981
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/12/1988
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17279A979 List:
References
NUDOCS 8804210079
Download: ML17279A981 (5)


Text

~y cGN ~RQ4~c~

~ MCPR OPERATING LIMITS rr t!y

~

MCPR Operating 1 imit, Uo to 106M Core Flow Cycl e Equipment Exposure Status G Fuel AHF Fuel gg5'o 0 MMD - ~X MMD HIU HTU g750 /. Vo /,3/

2. NMO " FOC MMO Hormal scram times""

NTU Mt Lf

+750 /.3$

3. WD - EOC MMO Control rod insertion biTU HTU bounded by Tech. Spec.

limits (3.1.3.4-3/4 1-7)

4. ~

g1$ 'o MMD Hl U

- EOC MMD HK p

RPT inoperable Hormal scram times 5'o

/. 55 1,37 p 750

5. ~~0'MO " EOC MMO RPT inoperable HTU NIU Control rod insertion bounded by Tech. Spec.

limits (3. 1.3.4-3/4 1-7) goC ~~ p FFTR

~ DR~WC. gCnA e ~f kfpS ~ ~

/

-In this portion of the fuel cycle, operaiion with the given MCPR operating limits is allowed for boih normal and Tech. Spec. scram times and for both RPT oper able and inoperable.

". "These MCPR values are based on the AHF Reload Safety Analysis performed using the control rod insertion times shown below (defined as normal scram) ~ In the event that surveillance 4. 1. 3. 2 shows these scram insertion times have been exceeded, the plant thermal limits associated with normal scram times default to the values associated with Tech. Spec. scram times (3.1.3.4-p 3/4 1-7),

and the scram insertion times must meet ihe requirements of Tech. Spec.

3.1. 3. 4.

AV OS Slowest measured averaae control rod U1% insertion times io specified notches OO for all operable control rods for each

,QOw Position Inserted From group of 4 control rods arranged in a Inuv

~t3% Full Mithdrawn a two-bv-two arraY (seconds)

V Hotch 45 . 404 Hotch 39 :eeo Hotch 25 l. 504 NX 4 otc 5 2 624 7, 5oc wmO F'p 7 W coArtR04 Ro 0 pr!EV(/HEARSTl' I hJSGB.v ioV v

~

~ >> r\

5PEc. Lim(ry (y./, p. 4W 7/V z-v) fiouVDBO~8p'"'Ecru.

P ~

Si RP~

MGC.B / oo P o PERE TsoLt Pen.egg. 9 'A

( 40 /,yT 2 342- menamen . 45 f EMP/U6 NRC P/'Phovhl. o/= F-/=7m g /gE ~5'/AJG p

> ~~~. PE+a/M C Ngc p /'('Rovh/- oF 5/QG/-/= /ODP g((Eu5/uG 8//EMPIRE/JT

l V

~ ~ OIL

CO Z

Z 70 Q

0Z Z

C o 60 m

Zl I Q C

Z  ; K 50 40 l

1 30 L

0 O

j 20 10 0

j".j 30 40 50 60 70

~

Core Flow (% Rated) 880197.5M Thermal Power Limits of Specification 3.3.10-1 Fi g ure 3.3.10-1

i 4

I ~ 1l,a

~ ' >'", > ~ >>>>>W yaw >> >j L >> L k> '> j * ~ >>('>.

WNP-2 Power History <Cycle 3) of Pated Thermal Power

$ 10, POHER 1P0.

90

'8 78, 60

'0.

20.

~ ~

0. APR HAY
JUll JUL SEP OCT WOV DEC JAN FEB HAR AUG JUAe 3'o l'lay 88 Figure 3.1 Power History For MNP-2 For Cycle 3