ML17279A926
| ML17279A926 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/17/1988 |
| From: | Samworth R Office of Nuclear Reactor Regulation |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| IEB-87-001, IEB-87-1, NUDOCS 8803310252 | |
| Download: ML17279A926 (3) | |
Text
March 17,
@988 Docket~No.
50-397 Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply Systems P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
SUBJECT:
NRC BULLETIN 87-01, "THINNING OF PIPE WALLS AT NUCLEAR POWER PLANTS On July 9, 1987, NRC Bulletin 87-01 was issued and requested that licensees submit information concerning their programs for monitoring the thickness of pipe walls in high-energy single-phase and two-phase carbon steel piping systems.
Washington Public Power Supply System provided its response to the Bulletin in a letter dated September 14, 1987 (G02-87-245).
The information that you provided is being used to determine the extent of industry participation and implementation of erosion/corrosion inspection
- programs, and to obtain data on observed pipe wall thinning.
The staff does not plan to determine the adequacy or the acceptability of your current program at this time.
As such, no further plant specific action with respect to NRCB 87-01 is required.
You will be notified should there be any future action that may be required regarding the subject of pipe wall thinning.
Sincerely, original signed by Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects DISTRIBUTION..
NRC 8 LPDR's PD V Reading DMCrutchfield RSamworth 8803310252 8803l7 EJor dan 'DR ADaCK 05000397 JPartl ow -...
PDR~
ACRS (10)
OFC
.D SP/PDV DRS PDV NAME :RBSamworth:dr l
ighton DATE:03//6/88: 03//1/88 OFFICIAL RECORD COPY
'CM M
l I
Me M
I M
(
e Ie y
',M I
f'(
et%
~ ">
e w
a e,
M I
MI A
A, 1
M f
II t
kl il"(
~ I
)
e I
Mr. G., C. Sorensen, Manager Washin)ton Public Power Supply System WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Nicholas S. Reynolds, Esq.
- Bishop, Cook, Purcell 5 Reynolds 1400 L Street NW Washington, D.C.
20005-3502 Mr. G.
E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-11 Olympia, Washington 98504 Mr. P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.
Box 968, MD 956B Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.
Box 968, MD 1023
- Richland, WA 99352 Mr. R.
B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD 280 Richland, Washington 99352 Mr. C.
M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box MD 927M Richland, Washington 99352 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioners
- Prosser, Washington 99350