Advises That 870422 Rev 11 to Operational QA Program Description Consistent W/Provisions of 10CFR50,App B & Acceptable.Nrc Should Be Notified of Any Changes to Other Operative QA Commitments Outside SAR QA Program Description
ML17279A344
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/08/1987
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8706150137
Download: ML17279A344 (2)


Text

ULAT INFORMATION DIST UTIO

'(STEM (RIDS)

ACCESSION NBR: 8 06150137 DOC. DATE: 87/06/08 NOTARIZED:

NO FACIL: 50-3'77 WPPSS Nuclear Pro Ject>

Unit 2>

Washington Public Powe AUTH. NAME AUTHOR AFFILIATION KIRSCH> D. F.

Region 5> Office of Director REC IP. NAME RECIPIENT AFFILIATION SORENSEN> Q. C.

Washington Public Power Supply System

SUBJECT:

Advises that Rev 11 to WPPSS-GA-004 Operational GA Program Description continues to meet requirements of 10CFR50>

App B

8< acceptable.

DISTRIBUTION CODE:

IEDID COPIES RECEIVED: LTR i ENCL 0 SIZE:

TITLE: Qeneral(50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

DOCKET 050003'P7 RECIPIENT ID CODE/NAME PD5 L*

SAMWORTH> R INTERNAL: ACRS DEDRO NRR ROE> M. L NRR/DREP/EPB NRR/DRIS DIR OQC/HDS2 RES DEPY QI EXTERNAL:

LPDR NSIC COPIES LTTR ENCL REC IP IENT ID CODE/NAME PD5 PD AEOD ENF LIEBERMAN NRR/DOEA DIR NRR/DREP/RPB ht

/ILRB RQN5 FILE 01 NRC PDR COP IES LTTR ENCL 1

1 1

2 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 23 ENCL

June 8, 1987 Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99352 Attention:

Mr. G.

C. Sorensen

Manager, Regulatory Programs

SUBJECT:

OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004),

REVISION ll On April 22, 1987, you submitted Revision 11 of the Operational QA Program Description (WPPSS-QA-004).

We have reviewed the changes addressed in Revision ll and find that it continues to meet the requirements of 10 CFR 50, Appendix B; therefore, the changes are acceptable.

If there are changes to other operative QA commitments existing in docketed correspondence outside of the SAR QA program description, you are obligated to notify this office.

Implementing such changes should be based on 10 CFR 50.54(a)(3).

If you have any ouestion regarding this matter, please contact W..J.

Wagner of my staff at (415) 943-3731.

Sincer ely, CC:

R. B. Samworth, NRR R. T. Dodds, RV J.

G. Sproul, QAB Section Chiefs Branch Chief RSB/Document Control Desk (RIDS)

/5/

Dennis F. Kirsch, Director Divisi on of Reactor Safety and Projects RV/jk RE UEST C