ML17278B183
| ML17278B183 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/10/1987 |
| From: | Diggs R NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 8702170283 | |
| Download: ML17278B183 (2) | |
Text
FEB 10 887 0
Docket No. 50-397 Washington Public Power Supply System ATTN:
Mr. G.
C. Sorensen, Manager P.O.
Box 968 3000 George Washington Way
- Richland, WA 99352 Gentlemen:
We have received a copy of your application dated November 20, 1986, which was filed with the Office of Nuclear Reactor Regulation (ONRR) for review.
This application submitted for NRC staff approval a turbine system maintenance program as required by License Condition 2.C.(7) of Facility Operating License No.
NPF-21 for the HPPSS Nuclear Project No. 2.
The fee required pursuant to 10 CFR 170 was not remitted with your application.
Therefore, it is requested that the Supply System remit the application fee of $ 150 for your November 20 request.
The Supply System will be billed for any additional costs for the review of your application in accordance with 10 CFR 170.12(c) and 170.21.
Sincerely, g(gl8A b7.~
'peag'.
+1@@6 Reba M. Diggs Facilities Program Coordinator License Fee Management Branch Division of Accounting and Finance Office of Resource Management DISTRIBUTION:
PDR LPDR
-yReg Files~
JBradfute, BWD-3
- EHylton, BWD-3
- RMDiggs, LFMB LFMB Reactor File
'FMB Pending Check File RM/A R/F LFMB R/F (2)
0 FICE: RM L~
.'RM LF SURNAME
- TLTremper:wp:
RM iggs DATE:2/
/87 I//87
~
~
~
~
T