Docket No.
50-397 January 6,
1987 DISTRIBUTION.:
L~0=397 NRC PDR Local PDR BhID-3 r/f EAdensam JBr adfute
- EHylton,
~, RBernero
- Attorney, OGC
,JPartlow
'Jordan BGrimes ACRS (10)
Subject:
10 CFR 50.62, ATWS Rule J
t In accordance with 10 CFR 50.62(c)(6), licensees and applicants for boiling water reactor (BWR) nuclear power plants are required to submit sufficient information to demonstrate to the Commission the adequacy of an alternate rod injection (ARI) system, a standby liquid control (SLC) system and a reliable reactor coolant recirculating pumps trip (RPT) system.
870ii20028 870i06 PDR ADOCK 0SOO0SV7i P
PDR I
l Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 300 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
The staff has completed its review of licensing topical report NEDE-31096-P, "Anticipated Transients Without Scram;
Response
to NRC ATWS Rule, 10 CFR 50.62",
submitted by the BWR Owner's Group.
NEDE-31096-P details conceptual designs to satisfy the 10 CFR 50.62 requirements for boiling water reactors.
The staff's safety evaluation of that report is enclosed for your information.
In order to complete the review of compliance with 10 CFR 50.62 for WNP-2, it is requested that you submit information as discussed above within 90 days of receipt of this letter.
As a participant in the BWR owners group topical report, you may reference the topical report in support of your plant specific submittal.
For the SLC system, you should choose one of the three alternatives and follow the conditions stated in the staff's SER.
For the ARI System, you may use the checklist (in Appendix A
of the staff's SER) to address your design requirements.
For the RPT System, you should indicate whether your installed system is the same as the Monticello design or the modified Hatch design.
The staff requires those utilities with other RPT designs to submit their schedule to upgrade their designs to either of the above approved designs or to demonstrate that their present design can perform its function in a reliable manner equivalent to the two approved designs.
'I, gll ghh
~
h:n
-e rht g (
~ '
h j
l "
e)
Ihl i'
'h
~
N h
I r,h I
~
'III' hg t;el h
~ e
~
~
'I I
I II h
I
Mr. G. C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Nicholas S. Reynolds, Esq.
Bishop, Liberman,
- Cook, Purcell 5 Reynolds 1200 Seventeenth
- Street, N.W.
Washington, D.C.
20036 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0. Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0. Box 968, MD 956B Richland, Washington 99352 Mr. W.
G.
Conn Burns and Roe, Incorporated c/o Washington Public Power Supply System P. 0.
Box 968, MD 994E Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0. Box 968, MD 280 Richland, Washington 99352 Mr. C. M. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box MD 927M Richland, Washington 99352 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
j 1 e
lt iC 6
4 IE
This request for information was approved by ONB under clearance number 3150-0011.
Sincerely,
Enclosure:
Safety Evaluation (ANO:8611030127) cc w/enclosure:
See next page John 0. Bradfute, Project Manager BWR Project Directorate No.
3 Division of BWR Licensing WD-3: D JBradfute/hmc 12//S/86 LAP
-:DBL Ethyl n
1245 /86 D:
3:DBL EAdensam
>glv/P
r fl f'
I r