Forwards Insp Rept 50-397/86-14 on 860428-0502.No Noncompliance noted.Post-outage Critique Should Focus on Root Cause of Three Instances Involving Spread of Radioactive Matl Contamination
ML17278A882
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/02/1986
From: Wenslawski F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17278A883 List:
References
NUDOCS 8606060026
Download: ML17278A882 (4)


See also: IR 05000397/1986014

Text

h '

SUN Oz >g88

Docket No. 50-397/qg

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. G.

C. Sorensen,

Manager

Regulatory Programs

Gentlemen:

Subject:

NRC Inspection

This letter refers to the routine inspection

conducted

by Messrs. M.,Cillis

and J.

E. Russell of this office on April 28 - May 2, 1986,"'and telephone

calls of May 8, 9,

12,

13,

and 14,

1986, of. activities authorized by NRC

License

No. NPF-21,

and to the discussion of 'our findings held by Mr. Cillis

with Mr. C. Powers

and other members

of. your staff at. the conclusion of the

inspection.

Areas

examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within the

scope of this inspection.

The attached

inspection report describes

three instances

involving the spread

of radioactive material contamination within your facility during the first

refueling outage.

These instances

were seemingly preventable.

We hope that

your post outa'ge critique will focus on the root cause of these

events

such

that corrective action will be taken, to minimize the potential for recurrence.

The frequency

and significance of contamination incidents are indicators which

we consider in evaluating your management

effectiveness.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document. Room.

ag060b002b

~000397;

ag0602

POR

ADQCH, 0

po

8

c~+~

I

(

4

~

/

C '

Should you have any questions

concerning this inspection,

we will 1e glad to

discuss

them with you.

Enclosure:

Inspection Report No. 50-397/86-14

Sincerely,

Original signed by

F. A, (Ven",davscki

7. A. Wenslawski,

Chief

Emergency Preparedness

and

Radiological Protection Branch

cc w/enclosure:

C.

M. Powers,

WNP-2 Plant Manager

P. L. Powell,

WNP-2 I,icensing Manager

R., B. Glasscock,

WNP-2 Director, Assurance

6 Iicensing

J.

D. Martin, WNP-2 Assistant Managing Director for Operations

G. E. Doupe, Esq.,

WPPSS

W.

G.

Conn,

Burns 8 Roe, Inc.

State of Washington

N. S. Reynolds,

Bishop, Liberman,

Cook, Purcell 8 Reynolds

bcc w/enclosure:

RSB/Document Control Desk

(RIDS)

Project Inspector

Resident Inspector

G.

Cook

B. Zaulkenberry

J. Martin

bcc w/o enclosure:

REGION V

MCillis/norma

Russell

6/Z /86

6/4. /86

GPYu as

6/g-/86

c~~

PAWenslawski

6/~/86

il

V

ll

VI

I

4

tt

'I