APR 07 198G
Docket Mo.'50-397
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Mr. G.
C. Sorensen
Manager of Regulatory Programs
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection conducted
by Messrs.
R.
C. Barr,
R. T. Dodds,
P.
H. Johnson,
D. J. Willett and A. D. Toth of Region V during February 3-
March 14,
1986 of activities authorized by NRC Operating License No. NPF-21,
and to the discussion of findings held by the inspectors with Mr. C.
M. Powers
at the conclusion of the inspection.
Areas
examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that certain of your
activities
was not conducted in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
Your response
to this Notice is to be submitted in accordance
with the
provisions of 10 CFR 2.201
as stated in Appendix A, Notice of Violation.
In accordance
with 10 CFR 2.790(a),
a copy of this letter, the enclosure,
and
your response will be placed in the
NRC Public Document
Room.
The responses
directed by this letter and the accompanying Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget as
required by the Paperwork Reduction Act of 1980,
PL 96-511.
~
.
8604220321
860407
<DR
- DOCK 0@000397
6
i
j
r
r~
I
I
I
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
A. E.
affee, Chief
Reactor Projects
Branch
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-397/86-06
cc w/enclosures:
C.
M. Powers,
WNP-2 Plant Manager
P. L. Powell,
WNP-2 Licensing Manager
R. B. Glasscock,
WNP-2 Director, Assurance
8 Licensing
State of Washington
N. S. Reynolds,
Debevois
and Liberman,
Cook, Purcell 6 Reynolds
bcc w/enclosures:
RSB/Document Control Desk (RIBS)
G. Cook,
RV
B. Zaulkenberry,
RV
J. Martin, RV
Resident Inspector
Project Inspector
bcc w/o enclosure
2:
IZMB
Re ion V
R arr/dot
~~86
0/0
Np,
++86 ~86 ~ /86
86 p/ 7186
q/q(gg
(e
~A
t'I
~
Ig
ft
h'
c
I
P
k
Rt
I
'
,I
~
Il