Forwards Insp Rept 50-397/85-37 on 851104-27 & Notice of Violation
ML17278A555
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/17/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17278A556 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8601080301
Download: ML17278A555 (4)


See also: IR 05000397/1985037

Text

Docket No. 50-397/~ 3~

OEt 271s86

Washington Public Power Supply System

P.

O. Box 968

Richland,

Washington

99352

'ttention:

Mr. G.

C. Sorensen

Manager of Regulatory Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Mssrs.

A. Toth and R. Waite of this

office during November 4-27,

1985 of activities authorized by NRC Operating

License

No. NPF-21,

and to the discussion of findings held by the inspectors

with Mr. C. Powers at the conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted in full compliance with NRC requirements,

as set

forth in the Notice of Violation, enclosed

herewith as Appendix A.

Your response

to this Notice is to be submitted in accordance

with the

provisions of 10 CFR 2.201

as stated in Appendix A, Notice of Violation.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

The responses

directed by this letter and the accompanying Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget as

required by the Paperwork Reduction Act of 1980,

PL 96-511.

8601080301

8512i7i

PDR

  • DOCK 05000397

POR,'---

'I

I

0

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

/I

Orfgfna'I,"fgnsd bj

Q, F'irsc'

~ L. Xx.rsch, Deputy Director

f Reactor Safety 8 Projects

Dxvxsxon o

Enclosure:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-397/85-37

cc:

C.

M. Powers,

WNP-2 Plant Manager

P. L. Powell,

WNP-2 Licensing Manager

R. B. Glasscock,

WNP-2 Director, Assurance

6 Licensing

State of Washington

N. S. Reynolds,

Debevois

and Liberman,

Cook, Purcell 6

Reynolds

bcc w/enclosures:

RSB/Document Control Desk

(RIDS)

Mr. Martin, RV

Mr. Faulkenberry,

RV

Mr. Cook,

RV

Project Inspector

Resident Inspector

bcc w/o enclosure

2:

IZMB

REGlON V/dot

12//(p/85

12/l4/85

P.

0

SON

12/f4 /85

KIRSC

12/(g/85

ht

hl

I

P

PJ

C

t

P mt I

hmh,

lt

~ 1

Pt

m

WP