ML17278A512

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/85-36 on 850928-1101 & Notice of Violation
ML17278A512
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/27/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17278A513 List:
References
NUDOCS 8512130382
Download: ML17278A512 (4)


See also: IR 05000397/1985036

Text

~

e

~

Docket No. 50-397/35+~

NOV SV i>>~

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. G.

C. Sorensen

Manager of Regulatory Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection conducted by Messrs.

A. Toth and R. Waite of

this office during September

28 through November 1,

1985 of activities

authorized

by NRC Operating License

No. NPF-21,

and to the discussion of

findings held by the inspectors with Mr. C. Powers at the conclusion of the

inspection.

Areas

examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Based

on the results of this inspection,'t

appears

that certain of your

activities were not conducted in full compliance with NRC requirements,

as set

forth in 'the Notice of. Violation',.enclosed

herewith as Appendix A.

'

Your response

to this Notice, is to be submitted in accordance

with the

provisions of 10 CFR 2.201 as'>stated

in Appendix A, Notice of Violation.

In accordance'ith

10 CFR 2.79'0(a),

a copy of this letter and the enclosure

will be placed in the NRC'ublic, Document

Room.

9

The responses

directed'y this letter and the accompanying Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget as

requir'ed by'he Paperwork Reduction Act of 1980,

PL 96-511.

1

0

e

t

8512130382

851127

PDR

ADOCK 05000397

8

PDR

i1

B~l

a

~

~

k

H

H

/W

l )

I

f

t

"/

5

) h

P

H

I I

Q

K

11 ~,

r

NOV 27 )S85

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Si cerely

F. Kirsc

De u y Director

ivision of

eactor Safety 8 Projects

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-397/85-36

cc w/enclosures:

C.

M. Powers,

WNP-2 Plant Manager

P. L. Powell,

WNP-2 Licensing Manager

R. B. Glasscock,

WNP-2 director, Assurance

8 Licensing

State of Washington

N. S. Reynolds,

Debevois

and Liberman,

Cook, Purcell 8

Reynolds

bcc w/enclosures:

RSB/Document Control Desk

(RIDS)

Mr. Martin, RV

Mr. Faulkenberry,

RV

Mr. Cook,

RV

Resident Inspector

bcc w/o enclosure

2:

LFMB

n

bcc (cover sheet

and -paragraph,l2'only):

Allegation File

(ATS RV-85-"A-'63)

f'l

REGI N V

TOT~

WAITE

P.

ON

ll/27/85

ll/27/85

ll/Z~/85'I

CH

ll/))/85

4/64~/<)-g cm

i/iz~/g

I

V

p.

l

i

1'

r

il

'I

$