ML17278A504

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Items 3.1.1 & 3.1.2 Re Reactor Trip Sys Components & Items 3.2.1 & 3.2.2 Re safety-related Components
ML17278A504
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/03/1985
From: Adensam E
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17278A505 List:
References
GL-83-28, TAC-53813, TAC-57428, NUDOCS 8512120523
Download: ML17278A504 (2)


Text

December 3, 1985 Docket No.:

50-397 Mr. G.

C. Sorensen, Manager Regulatory Programs Washington Public Power Supply Systems P.O.

Box 968 3000 George Washington Way Richland, Washington 99352

Dear Mr. Sorensen:

DI tel ION cket File NRC PDR Local PDR PRC System NSIC BWR PD¹3 R/F EHylton JBradfute OELD, Attorney ACRS (16)

JPartl,ow BGrimes EJordan Service List

. 0"0N tlCP i

lV PM UO)

OUI OM FQ ON Ov OlO OOO

%Ca) Q

Subject:

Safety Evaluation for Generic Letter 83-28, Post-Maintenance

Testing, Items 3. 1. 1 and 3. 1.2 (Reactor Trip System Components) and Items 3.2. 1 and 3.2.2 (All Other Safety-Related Components) for WNP-2 The staff has completed its review of the Post-Maintenance
Testing, Items
3. 1. 1 and 3. 1.2 (Reactor Trip System Components),

and Items 3.2. 1 and 3.2.2 (All Other Safety Related Components).

Copies of the related Safety Evaluations are enclosed.

The staff finds that the responses provided by the Supply System for these four items are acceptable.

This review completes the staff's action for Items 3. 1. 1, 3. 1.2, 3.2. 1, and 3.2.2 of Generic Letter 83-28 and closes these issues for WNP-2.

Sincerely, Elinor Adensam, Director BWR Project Directorate ¹3 Division of BWR Licensing

Enclosure:

As stated cc w/enclosure:

See next page LA:

D¹3 JBradfute:mn EH n

///Z//85 J[ /

/85

BWR:PD¹3 EAdensam lg g$ /85

4 kK 4

4

)

4>>

t

~

~

14, 44 4

~

~

~

4