ML17278A416

From kanterella
Jump to navigation Jump to search
Responds to Re NRC Fees Billed for OL Reviews for WPPSS 1,2 & 3 & Insp Fees for WPPSS-2.Forwards Documentation & NRC Procedures for Reviewing Disputed License Fee Billings. W/O Encl
ML17278A416
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 09/27/1985
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sorsensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8510030377
Download: ML17278A416 (4)


Text

C.

SEP 3y I85 Washington Public Power Supply System ATTN:

Mr. G.

C. Sorensen, Manager Regulatory Program P.O.

Box 968 3000 George Washington Way Richland, Washington 99352

Dear Mr. Sorensen:

This is in response to your letter of September 13, 1985. concerning fees that the NRC billed your company for the operating license reviews for the WHP-1/2/3 and inspection fees for WNP-2.

Enclosed you will find copies of the supporting documentation which was the basis for the bills issued to Washington Public Power Supply System for the three units.

NRC records maintained in support of fees are not subject, to audit by non-Governmental entities.

These records are made available to you to review for the purpose of verifying the accuracy of the data used by the NRC to determine the fee (professional staff hours' and contractual support costs).

If you believe an error exis6..$ p the computation. that fact, with supporting evidence should,@,"presefited to this office in writing. If merit is found in any such claitii, 'the".fdic.

~

will make an appropriate adjustment in the fee.

On the other hanct, if no merit is found, you would be so advised with reasons therefor.

If you still wish to meet with the I icense Fee Management Staff after you have reviewed the documentation furnished you or if you have questions.

please contact me.

We are enclosing for your information a copy of the "NRC Procedures For Reviewing Disputed License Fee Billings."

Si ncerely,

Enclosures:

1.

Fee Documentation 2.

NRC Procedures For Reviewing Disputed Billings Original Slgnc'8 hy Wm 0 ihiincr William 0. Miller, Director License Fee Management Staff Office of Administration

~ncc~

SURNAME DATC~

LFMS:A M CJ way:

9/

/85 LFMS ADM p

WOMiller 9/ 0

/85 r

85i0030377 BS0927 PDR ADOCK 05000397

~ '

PSR I-)'VRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY

P A

~

~

DISTRIBUTION:

PNorry, ADH HSpringer, ADM LSolander, NRR
JBlaha, IE
RBrown, NMSS
ANewsom, ACRS
Rfonner, ELD
RSmith, ELD RRakowski, RH/A MRodriguez, RM/A PDR LPDR Actual Manpower Files (3)

JBradfute, NRR

EHylton, NRR
VNerses, NRR
JLee, NRR
HDuncan, NRR RHDiggs CJHolloway (3)

DHeiss LFMS Reactor Files (3)

LFHS R/F Regulatory Docket File (50-460/397/508).

s

+~ ~

A