Docket No. 50-397
~~09~<<~07 eso903 PDR
- DOCK 05000397 I
1985 Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply Systems P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
SUBJECT:
SAFETY EVALUATION fOR GENERIC LETTER 83-28, POST-MAINTENANCE TESTING, ITEf1 3.1.3 (REACTOR TRIP SYSTEM COMPONENTS)
AND ITEM 3.2.3 (ALL OTHER SAFETY-RELATED COMPONENTS)
FOR WNP-2 The staff has completed its review of the Post-Maintenance
- Testing, Items 3.1.3 (Reactor Trip System Components) and 3.2.3 (All Other Safety Related Components).
The NRC contract reviewer finds that the responses provided by the Supply System for Items 3.1.3 and 3.2.3 are both acceptable and the staff concurs with these findings.
This review completes the staff's action for Items 3. 1.3 and 3.2.3 of Generic Letter 83-28 and closes these issues for WNP-2.
A copy of the related Technical Evaluation Report is enclosed.
Sincerely,
Enclosure:
As stated cc:
See next page Walter R. Butler, Chief Licensing Branch No.
2 Division of Licensing I'. Docket File NRC PDR JBradfute OELD,Vogler L882/DL/LA EHy1ton 8'/85 Local PDR PRC System ACRS(16)
JPartlow L ¹2 DL JBradfute:mk 8/gp/85 NSIC LB¹2Reading EHylton BGrimes EJordan LB¹2/DL/BC WButler 8fzP/85
t
~
I 1
t bti'l I
Docket No. 50-397 SEP 3
1985 Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply Systems P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, POST-MAINTENANCE TESTING, ITEM 3.1.3 (REACTOR TRIP SYSTEM COMPONENTS)
AND ITEM 3.2.3 (ALL OTHER SAFETY-RELATED COMPONENTS)
FOR WNP-2 The staff has completed its review of the Post-Maintenance
- Testing, Items 3.1.3 (Reactor Trip System Components) and 3.2.3 (All Other Safety Related Components).
The NRC contract reviewer finds that the responses provided by the Supply System for Items 3. 1.3 and 3.2.3 are both acceptable and the staff concurs with these findings.
This review completes the staff's action for Items 3. 1.3 and 3.2.3 of Generic Letter 83-28 and closes these issues for WNP-2.
A copy of the related Technical Evaluation Report is enclosed.
Sincerely,
Enclosure:
As stated cc:
See next page Walter R. Butler, Chief Licensing Branch No.
2 Division of Licensing Docket File 'RC PDR JBradfute OELD,Vogler LBE2/DL/LA EHyltoo 8+C}/85 Local PDR PRC System ACRS(16)
JPartl ow L ¹2DL JBradfute:mk 84/85 NSIC LB¹2Reading EHylton BGrimes EJordan LB¹2/DL/BC WButler 8@//85
14
~R REgy P0 Cy nO
~O
+**++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 8EP 3
1985 Docket No. 50-397 Ar
. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply Systems P.O.
Box 968 3000 George Washington Way
- Richland, Washington 99352
Dear Hr. Sorensen:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, POST-MAINTENANCE TESTING, ITEM 3. 1.3 (REACTOR TRIP SYSTEM COMPONENTS)
AND ITEN 3.2.3 (ALL OTHER SAFETY-RELATED COMPONENTS)
FOR WNP-2 The staff has completed its review of the Post-Maintenance
- Testing, Items 3.1.3 (Reactor Trip System Components) and 3.2.3 (All Other Safety Related Components).
The NRC contract reviewer finds that the responses provided by the Supply System for Items 3. 1.3 and 3.2.3 are both acceptable and the staff concurs with these findings.
This review completes the staff's action for Items 3.1.3 and 3.2.3 of -Generic Letter 83-28 and closes these issues for WNP-2.
A copy of the related Technical Evaluation Report is enclosed.
Sincerely,
Enclosure:
As stated cc:
See next page Walter R. Butler, Chief Licensing Branch No.
2 Division of Licensing
hr.
G.
C. Sorensen, Manager Washington Public Power Supply System HPPSS Nuclear Project lio.
2 (HNP-~)
CC:
Nicholas Reynold, Esquire Bishop, Cook, Liberman, Purcell 8 Reynolds 1200 Seventeenth
- Street, N.
W.
Washington, D. C.
20036 Mr. G.
E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington
.98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.
Box 968, liD 956B Richland, Washington 99352 Mr. H. G.
Conn Burns and Roe, Incorporated c/o Washington Public Power Supply System P. 0.
Box 968, MD 994E Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD 280 Richland, Washington 99352 Mr. C.
M. Powers HNP-2 Plant Manager
-Washington Public Power Supply System P. 0. Box MD 927M Richland, Washington 99352 Regional Administrator, Region V
U.S. Nuclear Regulatory Comnission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596