ML17278A371

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/85-11. Response to Item III in Notice of Violation Being Evaluated
ML17278A371
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/30/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
TAC-59581, NUDOCS 8509040076
Download: ML17278A371 (2)


See also: IR 05000397/1985011

Text

Becket No. 50-397)fS

I I

PUg 3 Q ~986

Washington Public Power Supply System

3000 George Washington

Way

Richland,

Washington

99352

Attention:

1ir.

G.

C. Sorensen,

51anager

Regulatory Programs

Gentlemen:

Thank you for your letter dated July 2,

1985, informing us of the steps

you

have taken to correct the items which we brought to your attention in our

letter dated

June 3,

1985.

Your response

to item III in our Notice of

Violation on the

CNSRB is still being evaluated.

We will respond to your

response

as

soon

as our evaluation is completed.

Your corrective actions

will be verified during

a future inspection.

Your cooperation with,us is appreciated.

Sincerely,

Orfginaf signed fjy

D. P:

Ki@PE4.

Acting Director

Division of Reactor Safety and Projects

bcc w/copy ltr dtd 7/2/85:

RSB/Document Control Desk

(RODS)

Mr. Martin, RV

State of WA

I'FklB

YO

/dot

8/g/85

KIRS H

8$ /85

g509040076

g000397

Soe30

'

pDR

AQQCN, 0

pDR'

N

f

t

L

1,

'J

l'

A