Forwards SER of Generic Ltr 83-28,Item 1.1 Re post-trip Review Program Description & Procedure.Program & Procedures Acceptable
ML17277B777
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/24/1985
From: Butler W
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17277B778 List:
References
GL-83-28, TAC-57517, NUDOCS 8506060574
Download: ML17277B777 (6)


Text

~ 0 Docket No.:

50-397 INY 24 f985 ~ y t1r. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply Systems Post Office Box 968 3000 George Washington Way Richland, Washington 99352

Dear t<r. Sorensen:

850bOb0574 850524 i

PDR ADOCK 05000397 I

P PDR

Subject:

WNP-2 Generic Letter 83-28, Item 1.1, Post-Trip Review (Program Description and Procedure)

The staff has completed its review of the Post-Trip Review Program and Procedures for WNP 2.

The staff finds that the Post-Trip Review Program and Procedures for WNP 2 are acceptable.

This completes the staff's action for Item 1.1 of Generic Letter 83-28.

A copy of the related Safety Evaluation is enclosed.

Sincerely,

Enclosure:

As stated cc:

See next page Walter R. Butler, Chief Licensing Branch No.

2 Division of Licensing DISTRIBUTION Docket File)

NRC PDR Local PDR PRC System NSIC LB82 Reading EHylton PH OELD, Attorney ACRS (16)

JPartlow BGrimes EJordan D

~

~

E on 05

/85 RA@

JBradfute 05/I'4'/85 DL:LB82 WButler 05/~+85

0 t

~ y

~ 0

~ gp,g 4Egg

~Co+

Wp

~ '

/p ++*++

Docket No.:

50-397 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MAY 2 4 I985 Hr. G. C. Sorensen, IIanager Regulatory Programs llashington Public Power Supply Systems Post Office Box 968 3000 George IWashington i<ay Richland, Washington 99352

Dear hr. Sorensen:

Subject:

I/NP-2 Generic Letter 83-28, Item 1. 1, Post-Trip Review (Program De cription and Procedure)

The staff has completed its review of the Post-Trip Review Program and Procedures for IlNP 2.

The staff finds that the Post-Trip Review Program and Procedures'for WHP 2 are acceptable.

This completes the staff's action for Item 1.1 of Generic Letter 83-28.

A copy of the related Safety Evaluation is enclosed.

Sincerely,

Enclosure:

As stated tlalter R. Butler, Chief Licensing Branch No.

2 Division of Licensing cc:

See nextpage'gi

0

~ ~

~ ~

'L I

Mr. G.

C. Sorensen, Manager Washington Public Power Supply System cc:

Nicholas Reynolds, Esquire

Bishop, Cook, Liberman, Purcell I5 Reynolds 1200 Seventeenth
Street, N.

W.

Washington, D. C.

20036 Mr. G.

E. Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968

'000 George Washington Way Richland, Washington 99532 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352 WPPSS Nuclear Project No.

2 (WNP-2)

Mr. John B. Martin U.S.

NRC, Region V

1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. W. G. Conn, SR.

N/M Group Supervisor Burns and

Roe, Incorporated 601 Williams Boulevard
Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0. Box 968, W0 650 Richland, Washington 99352 M. J.

D. Martin WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352 ljl,'<~i

,yO tip t