ML17277B718

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-21,changing Tech Spec Surveillance Requirement 4.6.1.7 to Provide Written Description of Location of Thermocouples Used to Determine Drywell Average Air Temp.Fee Paid
ML17277B718
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/19/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17277B719 List:
References
GO2-85-209, TAC-57547, NUDOCS 8504300425
Download: ML17277B718 (8)


Text

REGUDRQ(NFORMATION DISTRI OUT+I TEM (RIDS)

ACCESSION NBR; 85043004?5 DOC ~ DATE o 85/04/19 NOTARI2ED: YES DOCKET FACIL;50 397 WPPSS Nuclear Projecti Unit 2i Washington" Public Powe 05000397 AUTH INANE AUTHOR AFFILIATXON SORENSENiG.C, ,Washington Public Power- Supply System RECIP ~ NAME RECIPIENT AFFILIATION SCHWENCERiA ~ Licensing Branch 2

SUBJECT:

Application for amend to License NPF>>21ichanging Tech" Spec Surveillance. Requirement 4.6, 1,7 to provide writ ten description of location of thermacouples used to determing drywell average air temp,Fee, paid.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR

""..3.+

~ E ~ ~mwmasasas sa TITLE:= OR Submittal: General Distribution NOTESs 05000397 OL: 12/? 0/83 RECIPIENT COPIES RECIPIENT: COPIES ID CODE/NAME LTTR ENCL" ID CODE/NAME. L(TTR NRR LB2 BC 01" 7 7 ENCL'INTERNAL:

ACRS 09 6 6 ADM/LFMB'RR/DE/MTEB 1 0 ELD/HDS2 1 0 1 NRR/DL DIR 1 1 NRR/DL/DRAB 1 0.

NRR/DL/TSRG 1 1 METB 1 NRR/DS I/RAB 1 1 REG FI 04 1 1 RGN5 1=- 1 EXTERNAL; EG8G BRUSKE/S 1 LPDR 03 1 1 NRC PDR. 02' 1 1 NSIC 05 1 1 f lb'. ~

~ (-7 4 S.'4%

.TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL ?4

~ ~ ~ ~ C n

A )I Il '4 0 I

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 April 19, 1985 G02-85-209 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission llashington, D.C. 20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 4.6.1.7 In accordance with the Code of Federal Regulations (CFR), Title 10, Parts 50.90 and 2. 101, the Supply System hereby requests an amendment to the Technical Specifications. Specifically, the Supply System is requesting a change to Surveillance Requirement 4.6. 1.7 (pg. 3/4 6-10, attached) which will provide a written description of the location(s) of the thermocouples (T/C's) used to determine the drywell average air temperature in lieu of the specific elevations/azimuths now contained in the Technical Specifica-tions.

This change is being requested in order to provide the plant with some flexibility in actual detector (T/C) location for surveillance purposes, while still maintaining the original concept. This change will actually provide an improved temperature profile due to the elimination of the annulus temperature intrusion into the average.

The Supply System has reviewed this change per 10 CFR 50.59 and determined that no unreviewed safety questions will result from this amendment.

The Supply System has reviewed this change per 10 CFR 50.92 and determined that it does not:

1) Involve a significant increase in the probability or consequences of an accident previously evaluated because this change represents a modification to the configuration of the detectors, not a change in their design; or l

~.P pip 8504300425 8504i9 PDR ADQCK 05000397 P PDR c8+

'k t

1*,

3 ~

0 g V

6

~

k)

~ ~

~ ~ 0 A. Schwencer 0 Page Two April 19, 1985 REQUEST FOR AMENDMENT TO TECH. SPEC. SURVEILLANCE REQUIREMENT 4.6. 1.7

2) Create the possibility of a new or different kind of accident than previously evaluated because these devices are passive, providing no direct mitigation of an accident. Therefore, they could not create the potential for a different type of accident than previously identified in the FSAR; or
3) Involve a significant reduction in a margin of safety because the original intent of the LCO is being maintained. The actual sensors to be used for determining average air temperature is changing due to a design change to the drywell cooling system, while the number remains the same. The margin of safety is, therefore, also maintained.

The Supply System has evaluated this request in accordance with the criteria contained in 10 CFR 170.21, and has included a warrant for One hundred Fifty dollars ($ 150.00) as initial payment for this application for amendment under Facility Category A (Power Reactors).

In accordance with 10 CFR 50.91, the State of Washington has been provided a copy of this letter.

This Technical Specification change has been reviewed and approved by the WNP-2 Plant Operations Committee (POC) and the Supply System Corporate Nuclear Safety Review Board (CNSRB).

The Supply System would like to implement this change prior to startup following the H-3 outage, or as soon as practicable thereafter. Therefore, we request that a target date of July 1, 1985 be established for final NRC disposition.

Should you have any questions, please contact Hr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly ours, G. C. Sorensen, Manager Regulatory Programs HLA/tmh Attachments cc: R Auluck - NRC JO Bradfute - NRC WS Chin BPA C Eschels - EFSEC JB Martin - NRC RV E Revell - BPA AD Toth NRC Site

~ 0 0 ~ {

C 1',

J ~

I, gb

NP-2 OL NPF-21 equest for Amendment to Tech. Specs.

STATE OF WASHINGTON ) SubJect Surv. Req. 4.6.1.7 County of Benton I, G. C. SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

OATE / 1 a , 1985 G. C. Sor sen, Manager Regulatory Programs On this day personally appeared before me G. C. SORENSEN to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIYEN under my hand and seal this ~/ day of , 1985.

o ary PAb sc sn an or t e m

State of Washingto I

r s (1 Tg Residing at rf Jy e

a

~ P P

I P Q "ffPII'$f

'P I ~

jf

'e I" ff I ll

  • ,P, lf fjl II lj II P