Forwards Request for Addl Info Re Response to Generic Ltr 83-28,Items 2.1,2.2.1,2.2.2 & 4.5.3.Response Requested within 60 Days for Items 2.1,2.2.1 & 2.2.2 & within 90 Days for Item 4.5.3
ML17277B680
Person / Time
Site: Columbia 
Issue date: 03/19/1985
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Sorenson G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
GL-83-28, NUDOCS 8503280109
Download: ML17277B680 (9)


Text

~gS REJIG ci

+4 0

ty PA,

,+**++

Docket No. 50-397 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MAR 1 S l985 Mr. G.

C. Sorenson, Manager Regulatory Programs Washington Public Power Supply System P.O.

Box 968 3000 George Washington Way Richland, Washington 99352

Dear Hr. Sorenson:

SUBJECT:

RE(UEST FOR ADDITIONAL INFORMATION - PRELIMINARY STAFF.

REVIEW OF GENERIC LETTER 83-28 RESPONSES, WNP-2 The staff has completed a preliminary review to assess the completeness and adequacy of applicant/licensee responses to Generic Letter 83-28 Items 2.1, 2.2, 3.1.3, 3.2.3, 4.4 and 4.5.

For WNP-2 your responses were found to be incomplete for Items 2.1, 2.2.1, 2.2.2, and 4.5.3.

Brief descriptions of the deficiencies are provided as guidelines for corrective action in the enclosed request for additional information.

Efforts by Owners Groups, INPO and NSSS vendors have been or are being made to produce generic responses that may be useful in meeting the requirements of Generic Letter 83-28 Items 2. 1, 2.2.1; 2.2.2 and 4.5.3.

You may wish to contact these organizations regarding the applicability of such generic " -=.-

responses to your facility.

In order to preserve our present review schedule, the staff requests that you submit for review the supplementary information identified for Items 2.1, 2.2.1 and 2.2.2 within 60 days and for Item 4.5.3 within 90 days.

If you intend to formally-endorse the BWR Owners Group.response to Item 4.5.3 (NEDC-30844), please advise us-within 60 days.

Your plant specific response to Item 4.5.3 should then be provided within 90 days after the NRC completes its review and issues its evaluation of NEDC-30844 We request your cooperation in meeting this schedule.

This request for additional information was approved by the Office of Management and Budget under clearance number 3150-0011 which expires April 8503280109 850319 PDR ADOCK 05000397 P

PDR

/

I r-kl II I

4~

30, 1985.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C.

20503.

Sincerely, I

A. Schwencer,. Chief Licensing Branch No.

2 Division of Licensing cc:

See next page

30, 1985.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C.

20503.

Sincerely,

~niD81'soigne(( bp g A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing cc:

See next page Distribution: (Docket File) g E

Paton,OELD ACRS (16)

JStevens

()gd (4,(iI DR Local PDR JBradfute JPartlow TAlexion DLasher PRC System BGrimes DBeckham NSIC EJordan RAuluck LB¹2/DL/PM LB¹2/DL/BC JBradfute:lb ASch encer 03/

/85 03/I /85

eO

~l

,I I~

/

~'v )

II g k' H

II iP'

WNP-2 Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P. 0. Box 968 3000 George Washington Way Richland, Washington 99352 CC:

Nicholas Reynolds, Esquire

Bishop, Cook, Liberman, Purcell 8 Reynolds

.1200 Seventeenth

Street, N.

W.

Washington, D. C.

20036 Mr. G.

E. Doupe, Esquire Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99532

-Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-'l Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.

Box 968 Richland, Washington 99352

'Mr. W. G. Conn, SR.

N/M Grou'p Supervisor

'Burns and Roe,'ncorporated 601 Williams Boulevard

Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, MD 650

Richland, Washington 99352 M. J.

D. Martin WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington

.99352

~ 0 1

r ~

-W

~

~0

~O Enclosure MNP-2:

Item 2.1 (part 1) - Incomplete

\\ ~

Applicant needs to confirm that components needed to perform reactor trip are identified as safety-related on all documents and in information handling systems.

Item 2.2.1 - Incomplete Applicant needs to respond to sub-item 6 regarding classification of equipment important to safety.,

Item 2.2.2 and 2.1 (part 2) - Incomplete Applicant needs to describe revisions to his vendor interface, program to make it address all the concerns of'Item 2.2.2.

In this regard, applicant should note that the staff found. the NUTAC program fails to address the concern about establishing and maintaining an interface. between all vendors of safety-related equipment and the utility.

Item 4.5.3 - Inc'omplete Applicant needs to submit information showing that their current intervals will result in high reactor, trip system availability Qhen considering the concerns expressed in sub-items 4.5.3.1 to 4;5.3.5.

Proposed Technical Specification changes resulting from this review shall be submitted for"staff review.

The staff finds that modifications are not required.to permit nn-Tine testing of the backup scram valv'es.

However, the staff concludes that'testing of'he backup scram valves (including initiating circuitry) at a refuHing. outage frequency, in lieu of on-line testing, is appropriate and should be included=---

in the technical specifica ion surveillance requirements.

The licensee needs. to address this conclusion.

~ 1 l