ML17277B631
| ML17277B631 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/22/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17277B632 | List: |
| References | |
| NUDOCS 8503040441 | |
| Download: ML17277B631 (2) | |
Text
+H,StR EQyi
~C Wp r+
0 I
~.
Vl0 V~
++*++
UNITED STATES NUCLEAR REGULATORY COIVIIVIISSION REGION V 1450 MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 PE5 22 j985 Docket No. 50-397 Washington Public Power Supply System P.O.
Box 968 Richland, Washington 99352
'ttention:
Mr. D.
W. Mazur Managing Director Gentlemen:
Subject:
Enforcement Conference This will confirm Mr. B. H. Faulkenberry's telephone conversation with Mr. J.
W. Shannon on Pebruary 21, 1985 concerning an enforcement conference to be held between NRC and Supply System Management in the Region V Office at 9:00 a.m.
on February 28, 1985.
The following matters will be discussed with you:
Apparent violations identified during the February 1985 special NRC inspection of recent events at WNP-2.
2.
Prompt identification and reporting of operating events.
3.
NRC concerns.
4.
NRC enforcement options.
Anticipated attendees at the enforcement conference are shown on the enclosed meeting notice.
Enclosure:
As Stated Sincerely, s
D. P. Kirsch, Acting Director Division of Reactor Safety It Projects 8503040441 850222 PDR ADOCK 05000397 E
Q PDR RV/3k Pgf~
WILLETT~f P.
JOHN 2/
/85 2/'Z//85 r
A.
CHAEHEE A.
)OHNEON KIHECH 2/~( /85 2/Xt /85 2/ggg5 QF ol
e H
f lI'yl l "1